User Tools

Site Tools


start

This is an old revision of the document!


Accelerator Operation Handbook Wiki

Greg Leblanc]2021/10/20 16:45// Hello, welcome to the Ohio University Edwards Accelerator Laboratory accelerator operations handbook wiki. ====== OPERATION PROCEDURES ====== ===== Shift Change of Operator ===== * [[playground:shift|Shift Change Procedure * Update Lab IN/OUT Board ===== Staffing the Control Console ===== * Console Policy ===== Direct Reading Dosimeter (DRD) ===== * DRD Instructions ===== General Safe Operating Procedures ===== * See Sections III, IV, V, VI, and IX of the Radiation Safety Handbook ===== Source Instructions ===== * Alpha Source * Alphatross Source Head Drawing * Sputter Source * Sputter Source Target Pellet Change * Old HVEC Alpha Source ===== Accelerator Operation ===== * Startup * Shutdown * Changing Energy * Over Voltage Trip * Spark Instructions ===== Beam Operations ===== * Inflection Magnet Curve (AMU*KeV vs. AMPs) * Buncher/Extractor Tables * Charge State Yield Tables * Pulsing and Bunching * Computer Control of Quadrupoles * Changing Legs * NMR Setup * Beam Current Integrator * Venting/Shutdown/Regenerate the 45R Beam Line * Beam Energy: E = Terminal(charge state + 1) + injection energy * Slits and Energy Resolution: dE/E = 2(dR/R) ! R = 28“, dR is aperture size (each slit is 1/2 dR) * Swinger Operations * DAQ instructions www.daqlinux.com ===== Tritium Operations ===== * Tritium SOP ===== Facility Shutdown ===== * Facility Shutdown ====== EMERGENCY PROCEDURES ====== ===== Lab Safety & Warning Alarm Systems ===== * Descriptions and Operator Actions ===== Fire Alarm Systems ===== * Fire Alarm * VESDA ===== Emergency Responder Access ===== * Emergency Response Access SOP ===== Power Failures ===== * Short Interuption (<3 min) * Long Interuption ( >3 min) ===== Chemical & Radiation Emergencies ===== * See Section VIII of the Radiation Safety Handbook ===== Tritium Emergency ===== * Radiation Safety Handbook, Appendix 24: Tritium Gas Cells * Tritium Emergency Procedure (local copy, use RSH above as definitive copy) ====== TESTING, CALIBRATION, & SHUTDOWN ====== ===== Testing Policy & Interlock Rules ===== * Policy and Rules ===== Testing and Shutdown Logs ===== * Shutdown Test Log (blank form) * Safety & Warning Device Test Log (blank form) * Accidental Shutdown Log (blank form) ====== TRAINING FLOW & DOCUMENTATION ====== ===== Ohio Administrative Code and OUAL Compliance Statements ===== * OAC 3701:1-68-02 General requirements * OAC 3701:1-68-05 Non-medical particle accelerator systems * OUAL Compliance Statements *OAC 3701:1-38 General Radiation Protection Standards for Sources of Radiation ===== Accelerator Personnel Classifications ===== * Accelerator Personnel Classifications ===== Control Room Books ===== * Content and Inter-relation ===== Key Holder Training Flow ===== * Checklist ===== Operator 1 Training Flow ===== * Checklist ===== Operator 2 Training Flow ===== * Checklist ===== Operator Training Web Pages ===== *https://inpp.ohio.edu/~oual/operators/operators.php ====== Resource Materials ====== ===== Lab Layout ===== *Lab Layout ===== Safety ===== *Oxygen Monitors ===== OUAL Tandem Accelerator ===== * Tank, Tubes, & Column * Terminal Stripping * Pelletron Theory, OUAL Installation * Terminal Potential Stabilizer Function and Components * Panel Fronts and Labeling ===== Electrostatic Components ===== * Einzel Lenses * Gridded Lenses * Electrostatic Steerers ===== Magnets ===== 4 Bending Magnets: Inflection, Analyzer, Switcher, and Swinger Quadrupoles ===== Beam Measurement ===== * Faraday Cups * Current Meters * Beam Profile Monitors * Beam Pick Off * Beam Current Integrator (from the Beam Operations Section of the Operating Proceedures Book) ===== Videos ===== * Source Area Egress/Ingress (4 min) * Portable Survey Instruments - Gammas (8 min) * Portable Survey Instruments - Neutrons (5 min) * Making Distilled/De-ionized Water (5 min) * Levels of Vacuum (17 min) * Measurement Devices for Vacuum (36 min) * Mechanical Pumps - Lab Tour (3 min) * High Vacuum Pumps - Lab Tour (8 min) * Vacuum Connections (16 min) * Gate Valves and Valves (15 min) * Sputter Source Pellet Change (10 min) * Control Room Camera Station (3 min) * Alpha Source Startup (22 min) * Alpha Source Shutdown (3 min) * Sputter Source Startup (8 min) * Sputter Source Shutdown (3 min) ===== Engineering Info ===== * Alphatross Info * Training Info * Reference Documents * Inspection List - PDF * Inspection List - Excel * Inspection Instructions - PDF * Inspection Instructions - Word

start.1634762592.txt.gz · Last modified: 2021/10/20 16:43 by leblanc