start
This is an old revision of the document!
Table of Contents
Accelerator Operation Handbook Wiki
— Greg Leblanc 2021/10/20 16:45
Hello, welcome to the Ohio University Edwards Accelerator Laboratory accelerator operations handbook wiki.
OPERATION PROCEDURES
Shift Change of Operator
Staffing the Control Console
Direct Reading Dosimeter (DRD)
General Safe Operating Procedures
Source Instructions
Accelerator Operation
Beam Operations
- Beam Energy: E = Terminal(charge state + 1) + injection energy
- Slits and Energy Resolution: dE/E = 2(dR/R) ! R = 28“, dR is aperture size (each slit is 1/2 dR)
Tritium Operations
Facility Shutdown
EMERGENCY PROCEDURES
Lab Safety & Warning Alarm Systems
Fire Alarm Systems
Emergency Responder Access
Power Failures
Chemical & Radiation Emergencies
Tritium Emergency
- Tritium Emergency Procedure (local copy, use RSH above as definitive copy)
TESTING, CALIBRATION, & SHUTDOWN
Testing Policy & Interlock Rules
Testing and Shutdown Logs
TRAINING FLOW & DOCUMENTATION
Ohio Administrative Code and OUAL Compliance Statements
Accelerator Personnel Classifications
Control Room Books
Key Holder Training Flow
Operator 1 Training Flow
Operator 2 Training Flow
Operator Training Web Pages
Resource Materials
Lab Layout
Safety
OUAL Tandem Accelerator
Electrostatic Components
Magnets
4 Bending Magnets: Inflection, Analyzer, Switcher, and Swinger
Beam Measurement
Videos
Engineering Info
start.1694192772.txt.gz · Last modified: (external edit)
