User Tools

Site Tools


playground:sputter

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
playground:sputter [2020/08/18 14:48]
jacobs
playground:sputter [2021/03/22 10:17]
carter
Line 17: Line 17:
  
   - Ensure that desired beam target is loaded.   - Ensure that desired beam target is loaded.
-  - Set buncher ​tubes to correct configuration for desired beam species.+  - Set buncher ​tube selector switch ​to correct configuration for desired beam species.  Only rotate the switch clockwise. ​ This switch is a large high voltage rotary switch and the proper position aligns the position number in the center of the arrow marker The position between numbers fells like a detent but is actually the switch wiper falling between the contacts. ​ Do not have the switch in an apparent detent position. ​ Move the switch to the middle of the friction range with the number properly aligned with the arrow marker.
   - Check vacuum on LE extension, temperature gauge on cryopump should be at minimum value. ​   - Check vacuum on LE extension, temperature gauge on cryopump should be at minimum value. ​
   - Open source gate valve by pressing either button on gate valve control at source gate.   - Open source gate valve by pressing either button on gate valve control at source gate.
playground/sputter.txt ยท Last modified: 2023/08/22 07:50 by carter