User Tools

Site Tools


playground:sputter

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
playground:sputter [2017/03/20 09:51]
jacobs
playground:sputter [2020/08/18 14:48]
jacobs
Line 20: Line 20:
   - Check vacuum on LE extension, temperature gauge on cryopump should be at minimum value. ​   - Check vacuum on LE extension, temperature gauge on cryopump should be at minimum value. ​
   - Open source gate valve by pressing either button on gate valve control at source gate.   - Open source gate valve by pressing either button on gate valve control at source gate.
-  - Set cesium reservoir controller temperature set point (green numbers):  ​123C for ones of uAs, 130C for tens of uAs.+  - Set cesium reservoir controller temperature set point (green numbers):  ​117C for ones of uAs, 120C for tens of uAs.
   - Remove grounding hook from power supply platform and hang on gate before closing. ​   - Remove grounding hook from power supply platform and hang on gate before closing. ​
   - Close both gates to source area.  Orange lights on Glassman supplies should come on at gate closing. ​ (If not, check other gate on the other side of the accelerator;​ both must be secured.) ​   - Close both gates to source area.  Orange lights on Glassman supplies should come on at gate closing. ​ (If not, check other gate on the other side of the accelerator;​ both must be secured.) ​
playground/sputter.txt ยท Last modified: 2023/08/22 07:50 by carter