** Cs Sputter Source Startup Procedure ** | ** Cs Sputter Source Startup Procedure ** | ||
- | Last modified on 12/06/2006 | ||
- | General Considerations | ||
- | Cs Sputter Source Cutaway Diagram | ||
- | Cs Sputter Source High Voltage Supplies | ||
- | * The proper target must be installed. | + | ** General Considerations ** |
- | * The base pressure of 2 x 10E-6 torr or less. | + | |
- | General Preparations | + | * Review these illustrations: |
+ | * [[Cs_labeled|Cs Sputter Source Labeled Cutaway Diagram]] | ||
+ | * [[cutaway|Cs Sputter Source Cutaway Diagram]] | ||
+ | * [[hvsupplies|Cs Sputter Source High Voltage Supplies]] | ||
+ | * The proper target must be installed. (See Devon.) | ||
+ | * The base pressure of 2 × 10<sup>-6</sup> torr or less. | ||
+ | |||
+ | ** General Preparations ** | ||
- | 1. Ensure that desired beam target is loaded. | + | - Ensure that desired beam target is loaded. |
- | 2. Set buncher tubes to correct configuration for desired beam species. | + | - Set buncher tube selector switch to correct configuration for desired beam species. Only rotate the switch clockwise. This switch is a large high voltage rotary switch and the proper position aligns the position number in the center of the arrow marker The position between numbers feels like a detent but is actually the switch wiper falling between the contacts. Do not have the switch in an apparent detent position. Move the switch to the middle of the friction range with the number properly aligned with the arrow marker. |
- | 3. Check vacuum on LE extension.� | + | - Check vacuum on LE extension, temperature gauge on cryopump should be at minimum value. |
- | 4. Temperature gauge on cryopump should be well below the green mark. | + | - Open source gate valve by pressing either button on gate valve control at source gate. |
- | 5. Open source gate valve by pressing either button on gate valve control at source gate. | + | - Set cesium reservoir controller temperature set point (green numbers): 117C for ones of uAs, 120C for tens of uAs. |
- | 6. Remove grounding hook from power supply platform and hang on gate before closing.� | + | - Remove grounding hook from power supply platform and hang on gate before closing. |
- | 7. Close gate to source area. Orange lights on Glassman supplies should come on at gate closing. | + | - Close both gates to source area. Orange lights on Glassman supplies should come on at gate closing. (If not, check other gate on the other side of the accelerator; both must be secured.) |
- | 8. Use long plexi rod to turn on top 2 Glassmans (target and extractor) by pushing green buttons. | + | - Press the "doorbell" button on top the Pelletron AC Power Center. The Extractor and Target Glassman supplies should indicate Voltage Control with red lights. |
+ | - NOTE: In addition to the "doorbell" button there is a "boost" button that can be used in a case where the gate was only open for a short time and the yellow "power on" lights do not illuminate when the gates are closed. If the yellow lights do not come on with the gates closed and trying the "boost" button, leave the gate door open for 5 minutes then close the gate again and the yellow "power on" lights should illuminate and then press the "doorbell" button to turn on the HV supplies. | ||
** Startup and Normal Operation (in control room) ** | ** Startup and Normal Operation (in control room) ** | ||
- | 1. Turn on and set the Del main extractor supply to the desired voltage for the particular buncher setting. | + | - Turn on and set the **Del main extractor** supply to the desired voltage for the particular buncher setting. |
- | 2. Set the Glassman extractor power supply to 12.5 KV. Check to be sure the current is less than about 5 milliamps and the "control milliampres" light is NOT lit. High current indicates that the source needs serviced. | + | - Turn up the **ionizer** heater. The ionizer operates at 21-22 amps. Keep in mind that the current will fall slightly as the ionizer gets warmer. Keep adjusting the current until the ionizer is stable at 21-22 A. It should take about 1 minute to reach 21 A from the standby value of 10 A. |
- | 3. Set the Glassman target power supply to 6.5 kV. Check to be sure the current is less than about 5 milliamps and the "control milliampres" light is NOT lit. High current indicates that the source needs serviced. | + | - Turn up the Cesium **feed tube** heater to 0.450 amperes. |
- | 4. Slowly turn up the ionizer heater in small steps. ( This source has a HELICAL Ionizer). The helical ionizer operates at 21 amperes. It should take about ten (10) minutes to reach 21 A from the standby value of 10 A. Keep in mind that the amperage will fall slightly as the ionizer gets warmer.� Keep adjusting until the ionizer is stable at 21 A. | + | - Set the cesium **reservoir** heater current to **0.315** Amps. This is an approximate value above the needed power level. |
- | 5. Turn up the Cs feed tube heater to 0.450 amperes. | + | - Set the Glassman **extractor** power supply to 12.5 KV. Check to be sure the current is less than about 5 milliamps and the "control milliamperes" light is NOT lit. High current indicates that the source needs to be serviced. |
- | 6. Set the cesium reservoir heater to 0.380.� This should be enough to give ones of microamps beam for p and d. A setting of about 0.420 should produce tens of microamps.� Cs vaporization starts at a temperature of ~80 degree Celsius. The maximum reservoir temperature should not exceed 100 degrees Celsius.� The reservoir current should not exceed 0.500 | + | - Set the Glassman **target** power supply to 6.5 kV. Check to be sure the current is less than about 5 milliamps and the "control milliamperes" light is NOT lit. High current indicates that the source needs to be serviced. A newly installed pellet may cause instability for the first hour or so, but will become stable. |
- | 7. Tune the beam with the inflection magnet, source lens (about 1KV), lens A, and 2Y steerer. | + | - Set the Glassman **lens** power supply to 1.5 kV. |
- | 8. Monitor the target and extractor currents.� Target current should operate at around 2.5 milliamps, no more than 5 mA. | + | - **Tune the beam with the inflection magnet, source lens (usually about 1.5 kV), einzel lens A, and 2Y steerer.** The 2X steerer should be neutral (5.00 on dial) as X steering is be done by the inflection magnet at this stage. Make sure the inflection magnet deflection is set to "Right". |
+ | - Monitor the target and extractor currents: target current should be around 2.5 milliamps, and no more than 5 mA. If target current gets too high, reduce the cesium reservoir setting. | ||
** Out-gassing the source after cleaning ** | ** Out-gassing the source after cleaning ** | ||
- | 1. The source gate valve should be closed for this operation. | + | - The source gate valve should be closed for this operation. |
- | 2. Wait for normal vacuum. Normal is when the needle is in the blue mark on the gauge above the TV in the control room. | + | - Wait for normal vacuum. Normal is when the needle is in the blue mark on the gauge above the TV in the control room. |
- | 3. Set ionizer to 10A.� This will lead to a rise in the vacuum pressure. | + | - Set ionizer to 10A. This will lead to a rise in the vacuum pressure. |
- | 4. Wait for vacuum to fall back to the blue mark on the gauge | + | - Wait for vacuum to fall back to the blue mark on the gauge |
- | 5. Raise the ionizer by an additional� 2-3 A and wait for the vacuum to fall back into the blue range. | + | - Raise the ionizer by an additional 2-3 A and wait for the vacuum to fall back into the blue range. |
- | 6. Repeat this process until the ionizer is at 21 A and the vacuum is in the blue range. | + | - Repeat this process until the ionizer is at 21 A and the vacuum is in the blue range, may take 8 hours. |
- | 7. Open the source gate valve and carry out the Startup and Normal Operation. | + | - Open the source gate valve and carry out the Startup and Normal Operation. |
** Checklist for Target Pellet Change ** | ** Checklist for Target Pellet Change ** | ||
- | |||
- | ** Shut Down Procedure ** | + | * [[sputter:pellet|Sputter Source Target Pellet Change]] |
- | 1. Turn down the reservoir heater power supply. Off is about 0.070 A. | + | ** Shut Down Procedure ** |
- | 2. Wait for the reservoir temperature to drop below 80 degrees. | + | |
- | 3. Turn down the feed tube power supply. | + | |
- | 4. Wait for the feed tube temperature to drop below 80 degrees. | + | |
- | 5. Wait for the Target Supply current to fall to less than 1 milliamp. | + | |
- | 6. Turn the ionizer current down to 10 amps. (The ionizer current should be left at 10 amps.� This helps avoid the "poisoning" of the ionizer.) | + | |
- | 7. Turn down target and extractor voltages to zero. | + | |
- | 8. Turn off DEL high voltage supply. | + | |
- | 9. Close sputter source vacuum gate valve. | + | |
- | ** Original Credits ** | + | - **Cesium reservoir**: The reservoir has a temperature controller that turns the power on/off as needed for a constant temperature. The controller is located next to the analog temperature meter on the source power platform. The red numbers are the measured temperature, the green numbers are the set point temperature, there is a small red light that indicates when the controller is calling for power. The reservoir current switches between 0.150A and .315A as directed by the controller. |
- | + | - Wait until the reservoir controller's red power light is on and you can see about .315A reservoir current on the meter, run the reservoir current down on the digital meter until it stops. Make sure that you see controller red light on with minimal amps of current. | |
- | Maintained by: | + | - Wait for the reservoir temperature (red numbers on controller) to drop below** 85**° C. |
- | Thomas N. Massey | + | - Turn down the feed tube power supply. |
- | Office: Accelerator Lab 217 | + | - Wait for the feed tube temperature to drop below 80° C. |
- | Telephone: (740)593-0933 | + | - Wait for the Target Supply current to fall to less than 1 milliamp. |
- | E-Mail: MASSEY@OHIOU.EDU | + | - Turn the ionizer current down to 10 amps. (The ionizer current should be left at 10 amps. This helps avoid the "poisoning" of the ionizer.) |
- | Last modified on 12/06/2006 | + | - Turn down target and extractor voltages to zero. |
+ | - Turn off DEL high voltage supply. | ||
+ | - Close sputter source vacuum gate valve. | ||