User Tools

Site Tools


playground:powerout

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
playground:powerout [2015/10/16 15:09]
jacobs
playground:powerout [2015/10/16 15:10]
jacobs
Line 5: Line 5:
 The Operator should take the following actions after power is restored: The Operator should take the following actions after power is restored:
  
-1)     ​Silence any alarms that have activated+1)     ​Silence any alarms that have activated, E1/E2, shutdown module, tritium monitor.
  
 2)  Note how long the power was out. 2)  Note how long the power was out.
playground/powerout.txt ยท Last modified: 2020/07/12 13:49 by carter