Previous revision
Next revision Both sides next revision
playground:powerout [2012/02/15 12:52]
jacobs
playground:powerout [2015/10/16 15:10]
jacobs
Line 1: Line 1:
 **Power Failure** **Power Failure**
  
-A power outage lasting longer than 1 minute can not be recovered from without the attention of Accelerator staff and will take a minimum of 4 hours before operations can resume.+A power outage lasting longer than 1 minute ​will begin to create adverse conditions that can not be recovered from without the attention of Accelerator staff and will take a minimum of 4 hours before operations can resume.
  
 The Operator should take the following actions after power is restored: The Operator should take the following actions after power is restored:
  
-1)  Silence any alarms that have activated +1)     ​Silence any alarms that have activated, E1/E2, shutdown module, tritium monitor.
-2)  Notify Accelerator Staff of the situation +
-3)  Re-activate the cooling water loop pumps. The controls are located at the entry to the source area. (Ground the high voltage cage). Push each start button. The source cooling water must also be re-activated. This control is on the side of the cabinet that is against the wall by the sputter source. You may need to hold the “on” switch for several seconds before the pump will remain on+
  
-{{playground:​im001091s.jpg|}} {{playground:​im001093s.jpg|}}+2)  Note how long the power was out.
  
-4)  ​Check the status of the vault cryopump compressors. There is one in the high energy pumping station and one next to the low energy pumping station. If they are running, turn them off.  Red toggle switch on the front of the HE compressor, yellow breaker on the rear of the LE compressor.+3)  ​Notify Accelerator Staff of the situation
  
-{{playground:​im001094s.jpg|}} {{playground:​im003474s.jpg|}}+4)  Check the cooling water loop pumpsThe controls are located at the entry to the source area. (Ground the high voltage cage). If the green lights are still on no action is required. ​ If the green lights are off push each start button
  
-5)  Proceed to the mechanical room. Stand at the yellow circle painted on the floor in front of the main breaker panel. Push the reset and start buttons on panels A, B, & C. This will activate 2 air handlers, and the water pump behind you+{{playground:​im001091s.jpg|}} ​
  
-{{playground:​im001097s.jpg|}} {{playground:​im001096s.jpg|}}+5)  The source cooling water must also be re-activatedThis control is on the side of the cabinet that is against the wall by the sputter source. You may need to hold the “on” switch for several seconds before the pump will remain on
  
-6)  Return to the Control Room+{{playground:​im001093s.jpg|}}
  
-7)  ​Set all electrostatic devices ​to zero or neutraland then turn off+6)  ​Check the status of the vault cryopump compressors. There is one in the high energy pumping station and one next to the low energy pumping station. If they are running, turn them off.  Red toggle switch on the front of the HE compressor, yellow breaker on the rear of the LE compressor. ​ If your beam line has any manual pump gates valves, close them, and shut down your cryopumps if applicable. 
 + 
 +{{playground:​im001094s.jpg|}} {{playground:​im003474s.jpg|}}
  
-8)  ​On the control computer, go to the Restart tab and select the Settings Logger+7)  ​No action is required in the upstairs mechanical room.  HVAC systems should return ​to normal within 5 minutes of power restoration.
  
-9)  ​Set the TPS and Charging Controller ​to the Initial Condition values+8)  ​If the accelerator was running when the power went out, set all of its controls ​to the initial "​off"​ settings.
  
-10) Check the status of the fire alarm and take action as required+9 Check the status of the magnets. Each magnet control module should be showing a red light for standby or off condition.
  
 +10)  On the control computer, go to the Restart tab and select "​restart all"
  
  