User Tools

Site Tools


playground:console

This is an old revision of the document!


Manning the Control Console

If the Accelerator is running (flashing red lights on) the Operator (Op1 or Op2) may leave the Control Room for up to 10 minutes by posting a conspicuous sign on the control console stating “Operator will Return in 10 Minutes”.

An Operator 1 may not operate any console controls, including faraday cups, other than those items they have been specifically trained to use in reponse to emergency situations. The exception to this restriction is operation of controls under direct supervision of an Operator 2 who is in the control room.

In stable operations, when no changes or area access are anticipated, an Operator 2 may leave an Operator 1 at the control console for up to an hour. The Operator 1 shall not make any changes to controls or allow any access to closed areas while alone on console. The Operator 2 shall define which, if any, areas are accessable.

In experiments that are producing measurable radiation on the Fixed Radiation Monitor System, and there is a need to put in the cups and enter the target area and/or Vault, the operator shall carry the DRD with the “High Rad Mode” key attached into the areas. Removal of the key activates the 15 second LE cup delay. The DRD does not replace the need to do standard radiation surveys.

playground/console.1338918776.txt.gz · Last modified: 2012/06/05 13:52 by jacobs