User Tools

Site Tools


playground:console

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
playground:console [2012/02/21 19:10]
jacobs created
playground:console [2012/06/05 15:09] (current)
jacobs
Line 1: Line 1:
-**Manning ​the Control Console**+**Staffing ​the Control Console**
  
 If the Accelerator is running (flashing red lights on) the Operator (Op1 or Op2) may leave the Control Room for up to 10 minutes by posting a conspicuous sign on the control console stating "​Operator will Return in 10 Minutes"​. If the Accelerator is running (flashing red lights on) the Operator (Op1 or Op2) may leave the Control Room for up to 10 minutes by posting a conspicuous sign on the control console stating "​Operator will Return in 10 Minutes"​.
  
-An Operator 1 may not operate any console controls, including faraday cups, other than those items they have been trained to use in reponse to emergency situations. ​ The exception to this restriction is operation of controls under direct supervision of an Operator 2 who is in the control room.+An Operator 1 may not operate any console controls, including faraday cups, other than those items they have been specifically ​trained to use in reponse to emergency situations. ​ The exception to this restriction is operation of controls under direct supervision of an Operator 2 who is in the control room.
  
-stable operations, when no changes or area access are anticipated,​ an Operator 2 may leave an Operator 1 at the control console for up to an hour. The Operator 1 shall not make any changes to controls or allow any access to areas while alone on console.+In stable operations, when no changes or area access are anticipated,​ an Operator 2 may leave an Operator 1 at the control console for up to an hour. The Operator 1 shall not make any changes to controls or allow any access to closed ​areas while alone on console.  The Operator 2 shall define which, if any, areas are accessable.
  
-In experiments that are producing measurable radiation ​there shall be an Operator (Op1 or Op2) on console while the cups are in and there are people in the target area and/or Vault.  ​This will require a second ​individual with an Accelerator Personnel Classification to carry a DRD and escort visitors or survey ​the area if visitors require it.+If the experiment is producing measurable radiation on the Fixed Radiation Monitor System, ​and there is a need to enter the target area and/or Vault, the operator shall put in all Faraday cups and carry the DRD with the "High Rad Mode" key attached into the areas.  ​The key can only be removed when the 15 second ​LE cup delay is activated. The DRD does not replace ​the need to do standard radiation surveys. ​ Follow what the Radiation Safety Handbook says about surveys.
playground/console.1329869443.txt.gz ยท Last modified: 2012/02/21 19:10 by jacobs