This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Last revision Both sides next revision | ||
playground:console [2012/02/24 16:42] jacobs |
playground:console [2012/06/05 13:52] jacobs |
||
---|---|---|---|
Line 7: | Line 7: | ||
In stable operations, when no changes or area access are anticipated, an Operator 2 may leave an Operator 1 at the control console for up to an hour. The Operator 1 shall not make any changes to controls or allow any access to closed areas while alone on console. The Operator 2 shall define which, if any, areas are accessable. | In stable operations, when no changes or area access are anticipated, an Operator 2 may leave an Operator 1 at the control console for up to an hour. The Operator 1 shall not make any changes to controls or allow any access to closed areas while alone on console. The Operator 2 shall define which, if any, areas are accessable. | ||
- | In experiments that are producing measurable radiation on the Fixed Radiation Monitor System, there shall be an Operator (Op1 or Op2) on console while the cups are in and there are people in the target area and/or Vault. This will require a second individual with an Accelerator Personnel Classification to carry a DRD and escort visitors or survey the area if visitors require it. | + | In experiments that are producing measurable radiation on the Fixed Radiation Monitor System, and there is a need to put in the cups and enter the target area and/or Vault, the operator shall carry the DRD with the "High Rad Mode" key attached into the areas. Removal of the key activates the 15 second LE cup delay. The DRD does not replace the need to do standard radiation surveys. |