This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
start [2012/03/09 09:22] jacobs |
start [2012/06/12 15:06] jacobs |
||
---|---|---|---|
Line 13: | Line 13: | ||
- | ===== Manning the Control Console ===== | + | |
+ | |||
+ | ===== Staffing the Control Console ===== | ||
* [[playground:console|Console Policy]] | * [[playground:console|Console Policy]] | ||
+ | |||
+ | ===== Direct Reading Dosimeter (DRD) ===== | ||
+ | |||
+ | * [[playground:drd|DRD Instructions]] | ||
Line 43: | Line 49: | ||
* [[playground:trip|Over Voltage Trip]] | * [[playground:trip|Over Voltage Trip]] | ||
* [[playground:spark|Spark Instructions]] | * [[playground:spark|Spark Instructions]] | ||
+ | |||
+ | |||
+ | |||
Line 61: | Line 70: | ||
* {{buncher_tables.pdf|Buncher/Extractor Tables}} | * {{buncher_tables.pdf|Buncher/Extractor Tables}} | ||
* [[playground:pulsing|Pulsing and Bunching]] | * [[playground:pulsing|Pulsing and Bunching]] | ||
+ | * [[playground:quadControls|Computer Control of Quadrupoles]] | ||
* [[playground:changeleg|Changing Legs]] | * [[playground:changeleg|Changing Legs]] | ||
* [[playground:nmr|NMR Setup]] | * [[playground:nmr|NMR Setup]] | ||
* [[playground:integrator|Beam Current Integrator]] | * [[playground:integrator|Beam Current Integrator]] | ||
+ | |||
+ | * Beam Energy: E = Terminal(charge state + 1) + injection energy | ||
+ | |||
+ | * Slits and Energy Resolution: dE/E = 2(dR/R) ! R = 28", dR is aperture size (each slit is 1/2 dR) | ||
+ | |||
===== Facility Shutdown ===== | ===== Facility Shutdown ===== | ||
Line 147: | Line 162: | ||
* {{key_holder_training_flow.pdf|Checklist}} | * {{key_holder_training_flow.pdf|Checklist}} | ||
+ | |||
===== Operator 1 Training Flow ===== | ===== Operator 1 Training Flow ===== | ||
* {{operator_1_training_flow.pdf|Checklist}} | * {{operator_1_training_flow.pdf|Checklist}} | ||
+ | |||
+ | |||
+ | |||
+ | ===== Operator 2 Training Flow ===== | ||
+ | |||
+ | * {{operator_2_training_flow.pdf|Checklist}} | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | ====== Resource Materials ====== | ||
+ | |||
+ | ===== Lab Layout ===== | ||
+ | |||
+ | *[[Lab Layout]] | ||
+ | |||
+ | ===== OUAL Tandem Accelerator ===== | ||
+ | |||
+ | * [[playground:structure|Tank, Tubes, & Column]] | ||
+ | * [[playground:stripping|Terminal Stripping]] | ||
+ | * [[playground:pelletron|Pelletron Theory, OUAL Installation]] | ||
+ | * [[playground:TPS control|Terminal Potential Stabilizer Function and Components]] | ||
+ | * [[playground:control modules|Panel Fronts and Labeling]] | ||
+ | |||
+ | |||
+ | ===== Electrostatic Components ===== | ||
+ | |||
+ | * [[playground:Einzel|Einzel Lenses]] | ||
+ | * [[playground:grid|Gridded Lenses]] | ||
+ | * [[playground:steerers|Electrostatic Steerers]] | ||
+ | |||
+ | |||
+ | ===== Magnets ===== | ||
+ | |||
+ | 4 Bending Magnets: Inflection, Analyzer, Switcher, and Swinger | ||
+ | |||
+ | [[playground:quads|Quadrupoles]] | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | ===== Beam Measurement ===== | ||
+ | |||
+ | |||
+ | * [[Faraday Cups]] | ||
+ | * [[Current Meters]] | ||
+ | * [[Beam Profile Monitors]] | ||
+ | * [[Beam Pick Off]] | ||
+ | * [[playground:integrator|Beam Current Integrator (from the Beam Operations Section of the Operating Proceedures Book)]] | ||
+ | |||
+ | |||