User Tools

Site Tools


start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
start [2012/02/20 10:22]
jacobs
start [2014/09/03 15:21]
jacobs
Line 6: Line 6:
  
 ====== OPERATION PROCEDURES ====== ====== OPERATION PROCEDURES ======
 +
  
 ===== Shift Change of Operator ===== ===== Shift Change of Operator =====
  
  * [[playground:​shift|Shift Change Procedure]]  * [[playground:​shift|Shift Change Procedure]]
 +
 +
 +
 +
 +===== Staffing the Control Console =====
 +
 +  * [[playground:​console|Console Policy]]
 +
 +===== Direct Reading Dosimeter (DRD) =====
 +
 +  * [[playground:​drd|DRD Instructions]]
 +
 +
  
  
Line 18: Line 32:
 ===== General Safe Operating Procedures ===== ===== General Safe Operating Procedures =====
  
-  * See Sections III, IV, V, and VI of the Radiation Safety Handbook+  * [[http://​www.ohio.edu/​riskandsafety/​radiationsafety/​rad_saf_handbook.htm#​Htoc|See Sections III, IV, V, VI, and IX of the Radiation Safety Handbook]]
  
  
Line 35: Line 49:
  * [[playground:​trip|Over Voltage Trip]]  * [[playground:​trip|Over Voltage Trip]]
   * [[playground:​spark|Spark Instructions]]   * [[playground:​spark|Spark Instructions]]
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
  
  
Line 42: Line 72:
 ===== Beam Operations ===== ===== Beam Operations =====
  
 +
 +  * {{inflection.pdf|Inflection Magnet Curve (AMU*KeV vs. AMPs)}}
 +  * {{buncher_tables.pdf|Buncher/​Extractor Tables}}
 +  * {{charge exchange.pdf|Charge State Yield Tables}}
  * [[playground:​pulsing|Pulsing and Bunching]]  * [[playground:​pulsing|Pulsing and Bunching]]
 +  * [[playground:​quadControls|Computer Control of Quadrupoles]]
   * [[playground:​changeleg|Changing Legs]]   * [[playground:​changeleg|Changing Legs]]
   * [[playground:​nmr|NMR Setup]]   * [[playground:​nmr|NMR Setup]]
 +  * [[playground:​integrator|Beam Current Integrator]]
 +  * [[playground:​45R|Venting/​Shutdown/​Regenerate the 45R Beam Line]]
 +  * Beam Energy: ​ E = Terminal(charge state + 1) + injection energy
 +
 +  * Slits and Energy Resolution: ​ dE/E = 2(dR/​R) ​   ! R = 28", dR is aperture size (each slit is 1/2 dR)
 +  * [[playground:​swinger|Swinger Operations]]
 +
 +
  
 ===== Facility Shutdown ===== ===== Facility Shutdown =====
Line 71: Line 114:
         * [[playground:​power|Short Interuption (<1 min)]]         * [[playground:​power|Short Interuption (<1 min)]]
   * [[playground:​powerout|Long Interuption ( >1 min)]]   * [[playground:​powerout|Long Interuption ( >1 min)]]
 +
  
 ===== Chemical & Radiation Emergencies ===== ===== Chemical & Radiation Emergencies =====
  
-  * See Section VIII of the Radiation Safety Handbook+  * [[http://​www.ohio.edu/​riskandsafety/​radiationsafety/​rad_saf_handbook.htm#​Htoc|See Section VIII of the Radiation Safety Handbook]]
  
 ===== Tritium Emergency ===== ===== Tritium Emergency =====
Line 83: Line 127:
  
 ====== TESTING, CALIBRATION,​ & SHUTDOWN ====== ====== TESTING, CALIBRATION,​ & SHUTDOWN ======
 +
  
  
Line 89: Line 134:
   * [[playground:​interlock|Policy and Rules]]   * [[playground:​interlock|Policy and Rules]]
  
 +
 +
 +===== Testing and Shutdown Logs =====
 +
 +  * {{shutdown_test_log.pdf|Shutdown Test Log (blank form)}}
 +  * {{safety_warning_test_log.pdf|Safety & Warning Device Test Log (blank form)}}
 +  * {{accidental_shutdown_log.pdf|Accidental Shutdown Log (blank form)}}
  
  
  
 ====== TRAINING FLOW & DOCUMENTATION ====== ====== TRAINING FLOW & DOCUMENTATION ======
 +
 +
 +
 +
 +
 +
  
  
Line 99: Line 157:
 ===== Ohio Administrative Code and OUAL Compliance Statements ===== ===== Ohio Administrative Code and OUAL Compliance Statements =====
  
-  * [[http://​www.odh.ohio.gov/​ASSETS/​0CD47DC53BEB41B78B0DB8A6E2D7248B/Fr66_17.PDF|OAC 3701:1-66-17  ​Industrial Particle ​Accelerator]]+  * [[http://​www.odh.ohio.gov/​~/​media/​ODH/ASSETS/Files/rules/​final/​3701_1/​37011-68/​37011-68-05f.ashx|OAC 3701:1-68-05  ​Industrial Particle ​Accelerators]] 
 +  * [[http://​www.odh.ohio.gov/​~/​media/​ODH/​ASSETS/​Files/​rules/​final/​3701_1/​37011-68/​37011-68-05-apdx.ashx|OAC 3701:​1-68-05 ​ Appendix A]]
   * [[playground:​compliance|OUAL Compliance Statements]]   * [[playground:​compliance|OUAL Compliance Statements]]
-  *[[http://​www.odh.ohio.gov/​rules/​final/​f3701-1-38.aspx|OAC 3701:1-38 General Radiation Protection Standards for Sources of Radiation]]+  *[[http://​www.odh.ohio.gov/​rules/​final/​37011/37011-38.aspx|OAC 3701:1-38 General Radiation Protection Standards for Sources of Radiation]]
  
  
Line 108: Line 167:
  
   * {{personnel_classifications.pdf|Accelerator Personnel Classifications}}   * {{personnel_classifications.pdf|Accelerator Personnel Classifications}}
 +
 +
 +
  
  
Line 115: Line 177:
  
  
 +===== Key Holder Training Flow =====
 +
 +  * {{key_holder_training_flow.pdf|Checklist}}
  
  
Line 121: Line 186:
   * {{operator_1_training_flow.pdf|Checklist}}   * {{operator_1_training_flow.pdf|Checklist}}
  
 +
 +
 +===== Operator 2 Training Flow =====
 +
 +  * {{operator_2_training_flow.pdf|Checklist}}
 +
 +
 +
 +
 +
 +
 +
 +====== Resource Materials ======
 +
 +===== Lab Layout =====
 +
 +  *[[Lab Layout]]
 +
 +===== OUAL Tandem Accelerator =====
 +
 +  * [[playground:​structure|Tank,​ Tubes, & Column]]
 +  * [[playground:​stripping|Terminal Stripping]]
 +  * [[playground:​pelletron|Pelletron Theory, OUAL Installation]]
 +  * [[playground:​TPS control|Terminal Potential Stabilizer Function and Components]]
 +  * [[playground:​control modules|Panel Fronts and Labeling]]
 +
 +
 +===== Electrostatic Components =====
 +
 +  * [[playground:​Einzel|Einzel Lenses]]
 +  * [[playground:​grid|Gridded Lenses]]
 +  * [[playground:​steerers|Electrostatic Steerers]]
 +
 +
 +===== Magnets =====
 +
 +4 Bending Magnets: ​ Inflection, Analyzer, Switcher, and Swinger
 +
 +[[playground:​quads|Quadrupoles]]
 +
 +
 +
 +
 +
 +===== Beam Measurement =====
 +
 +
 +  * [[Faraday Cups]]
 +  * [[Current Meters]]
 +  * [[Beam Profile Monitors]]
 +  * [[Beam Pick Off]]
 +  * [[playground:​integrator|Beam Current Integrator (from the Beam Operations Section of the Operating Proceedures Book)]]
 +
 +
 +===== Operator Training Web Pages =====
 +
 +*[[https://​edwards1.phy.ohiou.edu/​~oual/​operators/​training/​optrain.php]]
  
  
start.txt · Last modified: 2023/09/08 13:06 by carter