This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
start [2012/02/20 10:22] jacobs |
start [2012/06/05 15:11] jacobs |
||
---|---|---|---|
Line 6: | Line 6: | ||
====== OPERATION PROCEDURES ====== | ====== OPERATION PROCEDURES ====== | ||
+ | |||
===== Shift Change of Operator ===== | ===== Shift Change of Operator ===== | ||
* [[playground:shift|Shift Change Procedure]] | * [[playground:shift|Shift Change Procedure]] | ||
+ | |||
+ | |||
+ | |||
+ | ===== Staffing the Control Console ===== | ||
+ | |||
+ | * [[playground:console|Console Policy]] | ||
+ | |||
+ | |||
Line 18: | Line 27: | ||
===== General Safe Operating Procedures ===== | ===== General Safe Operating Procedures ===== | ||
- | * See Sections III, IV, V, and VI of the Radiation Safety Handbook | + | * [[http://www.ohio.edu/riskandsafety/radiationsafety/rad_saf_handbook.htm#Htoc|See Sections III, IV, V, VI, and IX of the Radiation Safety Handbook]] |
Line 35: | Line 44: | ||
* [[playground:trip|Over Voltage Trip]] | * [[playground:trip|Over Voltage Trip]] | ||
* [[playground:spark|Spark Instructions]] | * [[playground:spark|Spark Instructions]] | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
Line 42: | Line 63: | ||
===== Beam Operations ===== | ===== Beam Operations ===== | ||
+ | * {{buncher_tables.pdf|Buncher/Extractor Tables}} | ||
* [[playground:pulsing|Pulsing and Bunching]] | * [[playground:pulsing|Pulsing and Bunching]] | ||
+ | * [[playground:quadControls|Computer Control of Quadrupoles]] | ||
* [[playground:changeleg|Changing Legs]] | * [[playground:changeleg|Changing Legs]] | ||
* [[playground:nmr|NMR Setup]] | * [[playground:nmr|NMR Setup]] | ||
+ | * [[playground:integrator|Beam Current Integrator]] | ||
+ | |||
+ | * Beam Energy: E = Terminal(charge state + 1) + injection energy | ||
+ | |||
+ | * Slits and Energy Resolution: dE/E = 2(dR/R) ! R = 28", dR is aperture size (each slit is 1/2 dR) | ||
+ | |||
===== Facility Shutdown ===== | ===== Facility Shutdown ===== | ||
Line 71: | Line 100: | ||
* [[playground:power|Short Interuption (<1 min)]] | * [[playground:power|Short Interuption (<1 min)]] | ||
* [[playground:powerout|Long Interuption ( >1 min)]] | * [[playground:powerout|Long Interuption ( >1 min)]] | ||
+ | |||
===== Chemical & Radiation Emergencies ===== | ===== Chemical & Radiation Emergencies ===== | ||
- | * See Section VIII of the Radiation Safety Handbook | + | * [[http://www.ohio.edu/riskandsafety/radiationsafety/rad_saf_handbook.htm#Htoc|See Section VIII of the Radiation Safety Handbook]] |
===== Tritium Emergency ===== | ===== Tritium Emergency ===== | ||
Line 83: | Line 113: | ||
====== TESTING, CALIBRATION, & SHUTDOWN ====== | ====== TESTING, CALIBRATION, & SHUTDOWN ====== | ||
+ | |||
Line 89: | Line 120: | ||
* [[playground:interlock|Policy and Rules]] | * [[playground:interlock|Policy and Rules]] | ||
+ | |||
+ | |||
+ | ===== Testing and Shutdown Logs ===== | ||
+ | |||
+ | * {{shutdown_test_log.pdf|Shutdown Test Log (blank form)}} | ||
+ | * {{safety_warning_test_log.pdf|Safety & Warning Device Test Log (blank form)}} | ||
+ | * {{accidental_shutdown_log.pdf|Accidental Shutdown Log (blank form)}} | ||
Line 108: | Line 146: | ||
* {{personnel_classifications.pdf|Accelerator Personnel Classifications}} | * {{personnel_classifications.pdf|Accelerator Personnel Classifications}} | ||
+ | |||
Line 115: | Line 154: | ||
+ | ===== Key Holder Training Flow ===== | ||
+ | |||
+ | * {{key_holder_training_flow.pdf|Checklist}} | ||
Line 120: | Line 162: | ||
* {{operator_1_training_flow.pdf|Checklist}} | * {{operator_1_training_flow.pdf|Checklist}} | ||
+ | |||
+ | |||
+ | |||
+ | ===== Operator 2 Training Flow ===== | ||
+ | |||
+ | * {{operator_2_training_flow.pdf|Checklist}} | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | ====== Resource Materials ====== | ||
+ | |||
+ | ===== Lab Layout ===== | ||
+ | |||
+ | *[[Lab Layout]] | ||
+ | |||
+ | ===== OUAL Tandem Accelerator ===== | ||
+ | |||
+ | * [[playground:structure|Tank, Tubes, & Column]] | ||
+ | * [[playground:stripping|Terminal Stripping]] | ||
+ | * [[playground:pelletron|Pelletron Theory, OUAL Installation]] | ||
+ | * [[playground:TPS control|Terminal Potential Stabilizer Function and Components]] | ||
+ | * [[playground:control modules|Panel Fronts and Labeling]] | ||
+ | |||
+ | |||
+ | ===== Electrostatic Components ===== | ||
+ | |||
+ | * [[playground:Einzel|Einzel Lenses]] | ||
+ | * [[playground:grid|Gridded Lenses]] | ||
+ | * [[playground:steerers|Electrostatic Steerers]] | ||
+ | |||
+ | |||
+ | ===== Magnets ===== | ||
+ | |||
+ | 4 Bending Magnets: Inflection, Analyzer, Switcher, and Swinger | ||
+ | |||
+ | [[playground:quads|Quadrupoles]] | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | ===== Beam Measurement ===== | ||
+ | |||
+ | |||
+ | * [[Faraday Cups]] | ||
+ | * [[Current Meters]] | ||
+ | * [[Beam Profile Monitors]] | ||
+ | * [[Beam Pick Off]] | ||
+ | * [[playground:integrator|Beam Current Integrator (from the Beam Operations Section of the Operating Proceedures Book)]] | ||
+ | |||
+ | |||