User Tools

Site Tools


start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
start [2012/02/20 09:12]
jacobs
start [2012/03/09 14:18]
jacobs
Line 6: Line 6:
  
 ====== OPERATION PROCEDURES ====== ====== OPERATION PROCEDURES ======
 +
  
 ===== Shift Change of Operator ===== ===== Shift Change of Operator =====
  
  * [[playground:​shift|Shift Change Procedure]]  * [[playground:​shift|Shift Change Procedure]]
 +
 +
 +===== Manning the Control Console =====
 +
 +  * [[playground:​console|Console Policy]]
 +
 +
  
  
Line 18: Line 26:
 ===== General Safe Operating Procedures ===== ===== General Safe Operating Procedures =====
  
-  * See Sections III, IV, V, and VI of the Radiation Safety Handbook+  * [[http://​www.ohio.edu/​riskandsafety/​radiationsafety/​rad_saf_handbook.htm#​Htoc|See Sections III, IV, V, VI, and IX of the Radiation Safety Handbook]]
  
  
Line 35: Line 43:
  * [[playground:​trip|Over Voltage Trip]]  * [[playground:​trip|Over Voltage Trip]]
   * [[playground:​spark|Spark Instructions]]   * [[playground:​spark|Spark Instructions]]
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
  
  
Line 42: Line 60:
 ===== Beam Operations ===== ===== Beam Operations =====
  
 +  * {{buncher_tables.pdf|Buncher/​Extractor Tables}}
  * [[playground:​pulsing|Pulsing and Bunching]]  * [[playground:​pulsing|Pulsing and Bunching]]
 +  * [[playground:​quads|Computer Control of Quadrupoles]]
   * [[playground:​changeleg|Changing Legs]]   * [[playground:​changeleg|Changing Legs]]
   * [[playground:​nmr|NMR Setup]]   * [[playground:​nmr|NMR Setup]]
 +  * [[playground:​integrator|Beam Current Integrator]]
  
 ===== Facility Shutdown ===== ===== Facility Shutdown =====
Line 71: Line 92:
         * [[playground:​power|Short Interuption (<1 min)]]         * [[playground:​power|Short Interuption (<1 min)]]
   * [[playground:​powerout|Long Interuption ( >1 min)]]   * [[playground:​powerout|Long Interuption ( >1 min)]]
 +
  
 ===== Chemical & Radiation Emergencies ===== ===== Chemical & Radiation Emergencies =====
  
-  * See Section VIII of the Radiation Safety Handbook+  * [[http://​www.ohio.edu/​riskandsafety/​radiationsafety/​rad_saf_handbook.htm#​Htoc|See Section VIII of the Radiation Safety Handbook]]
  
 ===== Tritium Emergency ===== ===== Tritium Emergency =====
Line 83: Line 105:
  
 ====== TESTING, CALIBRATION,​ & SHUTDOWN ====== ====== TESTING, CALIBRATION,​ & SHUTDOWN ======
 +
  
  
Line 89: Line 112:
   * [[playground:​interlock|Policy and Rules]]   * [[playground:​interlock|Policy and Rules]]
  
 +
 +
 +===== Testing and Shutdown Logs =====
 +
 +  * {{shutdown_test_log.pdf|Shutdown Test Log (blank form)}}
 +  * {{safety_warning_test_log.pdf|Safety & Warning Device Test Log (blank form)}}
 +  * {{accidental_shutdown_log.pdf|Accidental Shutdown Log (blank form)}}
  
  
Line 108: Line 138:
  
   * {{personnel_classifications.pdf|Accelerator Personnel Classifications}}   * {{personnel_classifications.pdf|Accelerator Personnel Classifications}}
 +
  
  
Line 115: Line 146:
  
  
 +===== Key Holder Training Flow =====
 +
 +  * {{key_holder_training_flow.pdf|Checklist}}
  
 ===== Operator 1 Training Flow ===== ===== Operator 1 Training Flow =====
  
-  * {{op1temp.pdf|Checklist}}+  * {{operator_1_training_flow.pdf|Checklist}}
  
  
  
start.txt ยท Last modified: 2023/09/08 13:06 by carter