User Tools

Site Tools


start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
start [2012/02/20 09:03]
jacobs
start [2012/02/21 18:32]
jacobs
Line 6: Line 6:
  
 ====== OPERATION PROCEDURES ====== ====== OPERATION PROCEDURES ======
 +
  
 ===== Shift Change of Operator ===== ===== Shift Change of Operator =====
  
  * [[playground:​shift|Shift Change Procedure]]  * [[playground:​shift|Shift Change Procedure]]
 +
 +===== Manning the Control Console =====
 +
 +  * [[playground:​console|Policy]]
 +
 +
  
  
-===== Interlock Rules ===== 
  
-  * [[playground:​interlock|Rules]] 
-  * [[playground:​interlock testing|Interlock Testing Policy]] 
  
 ===== General Safe Operating Procedures ===== ===== General Safe Operating Procedures =====
Line 84: Line 88:
  
 ====== TESTING, CALIBRATION,​ & SHUTDOWN ====== ====== TESTING, CALIBRATION,​ & SHUTDOWN ======
 +
 +
  
 ===== Testing Policy & Interlock Rules ===== ===== Testing Policy & Interlock Rules =====
  
 +  * [[playground:​interlock|Policy and Rules]]
  
 +
 +===== Testing and Shutdown Logs =====
 +
 +  * {{shutdown_test_log.pdf|Shutdown Test Log (blank form)}}
 +  * {{safety_warning_test_log.pdf|Safety & Warning Device Test Log (blank form)}}
 +  * {{accidental_shutdown_log.pdf|Accidental Shutdown Log (blank form)}}
  
  
  
 ====== TRAINING FLOW & DOCUMENTATION ====== ====== TRAINING FLOW & DOCUMENTATION ======
 +
 +
  
  
Line 98: Line 113:
   * [[http://​www.odh.ohio.gov/​ASSETS/​0CD47DC53BEB41B78B0DB8A6E2D7248B/​Fr66_17.PDF|OAC 3701:​1-66-17 ​ Industrial Particle Accelerator]]   * [[http://​www.odh.ohio.gov/​ASSETS/​0CD47DC53BEB41B78B0DB8A6E2D7248B/​Fr66_17.PDF|OAC 3701:​1-66-17 ​ Industrial Particle Accelerator]]
   * [[playground:​compliance|OUAL Compliance Statements]]   * [[playground:​compliance|OUAL Compliance Statements]]
 +  *[[http://​www.odh.ohio.gov/​rules/​final/​f3701-1-38.aspx|OAC 3701:1-38 General Radiation Protection Standards for Sources of Radiation]]
  
  
Line 104: Line 120:
  
   * {{personnel_classifications.pdf|Accelerator Personnel Classifications}}   * {{personnel_classifications.pdf|Accelerator Personnel Classifications}}
 +
  
  
Line 111: Line 128:
  
  
 +===== Key Holder Training Flow =====
 +
 +  * {{key_holder_training_flow.pdf|Checklist}}
  
 ===== Operator 1 Training Flow ===== ===== Operator 1 Training Flow =====
  
-  * {{op1temp.pdf|Checklist}}+  * {{operator_1_training_flow.pdf|Checklist}}
  
  
  
start.txt ยท Last modified: 2023/09/08 13:06 by carter