User Tools

Site Tools


start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
start [2012/02/16 09:40]
jacobs
start [2012/02/21 18:32]
jacobs
Line 6: Line 6:
  
 ====== OPERATION PROCEDURES ====== ====== OPERATION PROCEDURES ======
 +
  
 ===== Shift Change of Operator ===== ===== Shift Change of Operator =====
  
  * [[playground:​shift|Shift Change Procedure]]  * [[playground:​shift|Shift Change Procedure]]
 +
 +===== Manning the Control Console =====
 +
 +  * [[playground:​console|Policy]]
 +
 +
  
  
-===== Interlock Rules ===== 
  
-  * [[playground:​interlock|Rules]] 
-  * [[playground:​interlock testing|Interlock Testing Policy]] 
  
 ===== General Safe Operating Procedures ===== ===== General Safe Operating Procedures =====
Line 78: Line 82:
  
 ===== Tritium Emergency ===== ===== Tritium Emergency =====
 +    * [[http://​www.ohio.edu/​riskandsafety/​docs/​radiation/​RadManAppendix24.pdf|Radiation Safety Handbook, Appendix 24: Tritium Gas Cells]]
 +    * [[playground:​tritium_emergency|Tritium Emergency Procedure]] (local copy, use RSH above as definitive copy)
 +  ​
 +
 +
 +====== TESTING, CALIBRATION,​ & SHUTDOWN ======
 +
 +
 +
 +===== Testing Policy & Interlock Rules =====
 +
 +  * [[playground:​interlock|Policy and Rules]]
 +
 +
 +===== Testing and Shutdown Logs =====
 +
 +  * {{shutdown_test_log.pdf|Shutdown Test Log (blank form)}}
 +  * {{safety_warning_test_log.pdf|Safety & Warning Device Test Log (blank form)}}
 +  * {{accidental_shutdown_log.pdf|Accidental Shutdown Log (blank form)}}
 +
 +
 +
 +====== TRAINING FLOW & DOCUMENTATION ======
  
-  * See Appendix 24 of the Radiation Safety Handbook 
  
-====== Training Flow and Documentation ====== 
  
  
Line 88: Line 113:
   * [[http://​www.odh.ohio.gov/​ASSETS/​0CD47DC53BEB41B78B0DB8A6E2D7248B/​Fr66_17.PDF|OAC 3701:​1-66-17 ​ Industrial Particle Accelerator]]   * [[http://​www.odh.ohio.gov/​ASSETS/​0CD47DC53BEB41B78B0DB8A6E2D7248B/​Fr66_17.PDF|OAC 3701:​1-66-17 ​ Industrial Particle Accelerator]]
   * [[playground:​compliance|OUAL Compliance Statements]]   * [[playground:​compliance|OUAL Compliance Statements]]
 +  *[[http://​www.odh.ohio.gov/​rules/​final/​f3701-1-38.aspx|OAC 3701:1-38 General Radiation Protection Standards for Sources of Radiation]]
  
  
Line 94: Line 120:
  
   * {{personnel_classifications.pdf|Accelerator Personnel Classifications}}   * {{personnel_classifications.pdf|Accelerator Personnel Classifications}}
 +
  
  
Line 100: Line 127:
   * {{control_room_books.pdf|Content and Inter-relation}}   * {{control_room_books.pdf|Content and Inter-relation}}
  
 +
 +===== Key Holder Training Flow =====
 +
 +  * {{key_holder_training_flow.pdf|Checklist}}
  
 ===== Operator 1 Training Flow ===== ===== Operator 1 Training Flow =====
 +
 +  * {{operator_1_training_flow.pdf|Checklist}}
  
  
  
start.txt ยท Last modified: 2023/09/08 13:06 by carter