This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
playground:startup [2023/08/08 10:41] carter |
playground:startup [2023/08/15 17:20] carter |
||
---|---|---|---|
Line 1: | Line 1: | ||
====== Accelerator Start-up ====== | ====== Accelerator Start-up ====== | ||
- | ** Clear all Areas ** | + | === ==== ** Clear all Areas ** ==== === |
1. **Verify Initial Machine Voltage setup:** | 1. **Verify Initial Machine Voltage setup:** | ||
Line 75: | Line 76: | ||
**FOR OPERATION IN THE LARGE AND SMALL TARGET AREAS | **FOR OPERATION IN THE LARGE AND SMALL TARGET AREAS | ||
+ | ** | ||
+ | |||
+ | ** Note! These instructions are obsolete, see Don or Greg for new operating instructions | ||
** | ** | ||
Line 94: | Line 98: | ||
** FOR OPERATION ON THE SWINGER MAGNET | ** FOR OPERATION ON THE SWINGER MAGNET | ||
** | ** | ||
- | + | ** Note! These instructions are obsolete, see Don or Greg for new operating instructions | |
+ | ** | ||
a. Make sure both "analyzer" and "switcher_hz422" GUI's are turned down to zero amps using the GUI slider. | a. Make sure both "analyzer" and "switcher_hz422" GUI's are turned down to zero amps using the GUI slider. | ||