Line 20: Line 20:
   * CHARGING VOLTAGE dial: 0.10   * CHARGING VOLTAGE dial: 0.10
   * POWER SUPPLIES:​ OFF   * POWER SUPPLIES:​ OFF
 +
 +Initial condition on SHUTDOWN MODULE:
 +  * POWER: ​  Red Light On
 +  * CABLE: ​  Green Light On
 +
  
  
Line 25: Line 30:
 a.  Switch the POWER SUPPLIES to ON, the yellow light should come on. Switch CHAIN MOTORS to ON, lights 1, 2, and 3 should all come on.  Begin to increase the CHARGING VOLTAGE ​ while observing the TERMINAL VOLTAGE and the GRID VOLTAGE. ​ DO NOT allow the GRID VOLTAGE to become more negative than   -10 VDC.  ​ a.  Switch the POWER SUPPLIES to ON, the yellow light should come on. Switch CHAIN MOTORS to ON, lights 1, 2, and 3 should all come on.  Begin to increase the CHARGING VOLTAGE ​ while observing the TERMINAL VOLTAGE and the GRID VOLTAGE. ​ DO NOT allow the GRID VOLTAGE to become more negative than   -10 VDC.  ​
  
-b. Continue to increase the CHARGING VOLTAGE until you reach the approximate TERMINAL VOLTAGE ​OR until the GRID VOLTAGE reaches ​ -10 VDC, THEN proceed to step 2:+b. Continue to increase the CHARGING VOLTAGE until you reach the approximate TERMINAL VOLTAGE ​**__OR__** ​until the GRID VOLTAGE reaches ​ -10 VDC, **__THEN__** ​proceed to step 2:
  
  
Line 36: Line 41:
  
 b. Move the CORONA PROBE POSITION “OUT” to make the GRID VOLTAGE less negative. ​ This may require you to adjust the UPCHARGE to maintain TERMINAL VOLTAGE. b. Move the CORONA PROBE POSITION “OUT” to make the GRID VOLTAGE less negative. ​ This may require you to adjust the UPCHARGE to maintain TERMINAL VOLTAGE.
 +
 +  ​
 +  ​
  
 **3. Establish Control** **3. Establish Control**
  
-a. Set the TERMINAL VOLTAGE Dial to the desired value. ​ The dial is 2 turns per MV (3.0 on the dial is 1.5 MV)  +a. Set the TERMINAL VOLTAGE Dial to the desired value. ​ The dial is 2 turns per MV (set the dial to twice the GVM you want) You may have to add some upcharge after setting ​the dial.  ​
  
 b. Raise the CONTROL GAIN to 2-3 for low current beams, around 5 for high current beams. ​ The system is now controlling in GVM mode. b. Raise the CONTROL GAIN to 2-3 for low current beams, around 5 for high current beams. ​ The system is now controlling in GVM mode.
Line 51: Line 59:
 a. Tune beam and send it around the properly configured Analyzing Magnet. ​ a. Tune beam and send it around the properly configured Analyzing Magnet. ​
  
-b. You may need to make adjustments to the TERMINAL VOLTAGE dial to get the terminal to the proper energy for transmission around the magnet. ​+b. You may need to make adjustments to the TERMINAL VOLTAGE dial to get the terminal to the proper energy for transmission around the magnet ​and fairly balanced current on the slits
  
-c. When current is present on the LE and HE Slit current meters you may then switch the Control Mode to AUTO (middle position) and the SLIT control light should illuminate.+c. When current is present on the LE and HE Slit current meters you may then switch the Control Mode to AUTO (middle position) and the SLIT control light should illuminate.  If there is instability in slit control you may try raising the CONTROL GAIN more.
  
 d. When in AUTO control the machine will go back to GVM control anytime the beam is interrupted. d. When in AUTO control the machine will go back to GVM control anytime the beam is interrupted.
  