 ** Cs Sputter Source Startup Procedure ** ** Cs Sputter Source Startup Procedure **
  
-Last modified on 2009 March 19, 15:20\\+
  
 ** General Considerations **  ** General Considerations ** 
Line 17: Line 17:
   - Ensure that desired beam target is loaded.   - Ensure that desired beam target is loaded.
   - Set buncher tubes to correct configuration for desired beam species.   - Set buncher tubes to correct configuration for desired beam species.
-  - Check vacuum on LE extension.�  +  - Check vacuum on LE extension, temperature ​gauge on cryopump should be at minimum value
-  - Temperature ​gauge on cryopump should be well below the green mark+
   - Open source gate valve by pressing either button on gate valve control at source gate.   - Open source gate valve by pressing either button on gate valve control at source gate.
-  - Remove grounding hook from power supply platform and hang on gate before closing.�  +  - Remove grounding hook from power supply platform and hang on gate before closing.  
-  - Close gate to source area.  Orange lights on Glassman supplies should come on at gate closing. ​ (If not, check other gate on the other side of the accelerator;​ both must be secured.)  +  - Close both gates to source area.  Orange lights on Glassman supplies should come on at gate closing. ​ (If not, check other gate on the other side of the accelerator;​ both must be secured.)  
-  - Use long plexi rod to turn on top 2 Glassmans (target ​and extractor) by pushing green buttons. +  - Press the doorbell button ​on top the Pelletron AC Power Center. ​ The Extractor ​and Target Glassman supplies should indicate Voltage Control with red lights.
 ** Startup and Normal Operation (in control room) ** ** Startup and Normal Operation (in control room) **
  
-  - Turn on and set the Del main extractor supply to the desired voltage for the particular buncher setting. +  - Turn on and set the **Del main extractor** supply to the desired voltage for the particular buncher setting. 
-  - Set the Glassman extractor power supply to 12.5 KV. Check to be sure the current is less than about 5 milliamps and the "​control milliampres"​ light is NOT lit. High current indicates that the source needs serviced. +  - Turn up the ionizer heater. ​  The ionizer operates at 21 amperes. ​ Keep in mind that the current ​will fall slightly as the ionizer gets warmer. ​ Keep adjusting the current until the ionizer is stable at 21 A. It should take about 2 minutes to reach 21 A from the standby value of 10 A. 
-  - Set the Glassman target power supply to 6.5 kV. Check to be sure the current is less than about 5 milliamps and the "​control milliampres"​ light is NOT lit. High current indicates that the source needs serviced. +  - Turn up the Cesium **feed tube** heater to 0.450 amperes. ​  
-  - Slowly turn up the ionizer heater((This source has a HELICAL ionizer.)) in small steps.   The ionizer operates at 21 amperes. ​It should take about ten (10) minutes to reach 21 A from the standby value of 10 A. Keep in mind that the amperage ​will fall slightly as the ionizer gets warmer. ​ Keep adjusting the current until the ionizer is stable at 21 A. +  - Set the cesium ​**reservoir** heater to 0.275. This should be enough to give ones of microamps beam for p and d.    A setting of about 0.280 - 0.300 should produce tens of microamps. Cs vaporization starts at a temperature of ~80° Celsius. ​  The maximum reservoir temperature should not exceed ​130° Celsius. The reservoir current should not exceed 0.300. 
-  - Turn up the Cs feed tube heater to 0.450 amperes. ​  +  - Set the Glassman **extractor** power supply to 12.5 KV. Check to be sure the current is less than about 5 milliamps and the "​control milliamperes"​ light is NOT lit. High current indicates that the source needs to be serviced. 
-  - Set the cesium reservoir heater to 0.380.� This should be enough to give ones of microamps beam for p and d.    A setting of about 0.420 should produce tens of microamps.� Cs vaporization starts at a temperature of ~80° Celsius. ​  The maximum reservoir temperature should not exceed ​100° Celsius.� The reservoir current should not exceed 0.500 +  - Set the Glassman **target** power supply to 6.5 kV. Check to be sure the current is less than about 5 milliamps and the "​control milliamperes"​ light is NOT lit. High current indicates that the source needs to be serviced. 
-  - Tune the beam with the inflection magnet, source lens (usually about 1.5 kV), lens A, and 2Y steerer.+  - Set the Glassman **lens** power supply to 1.5 kV. 
 +  - **Tune the beam with the inflection magnet, source lens (usually about 1.5 kV), einzel ​lens A, and 2Y steerer.**  The 2X steerer should be neutral (5.00 on dial) as X steering is be done by the inflection magnet at this stage.
   - Monitor the target and extractor currents: target current should be around 2.5 milliamps, and no more than 5 mA.   - Monitor the target and extractor currents: target current should be around 2.5 milliamps, and no more than 5 mA.
  
Line 39: Line 38:
   - The source gate valve should be closed for this operation.   - The source gate valve should be closed for this operation.
   - Wait for normal vacuum. ​ Normal is when the needle is in the blue mark on the gauge above the TV in the control room.   - Wait for normal vacuum. ​ Normal is when the needle is in the blue mark on the gauge above the TV in the control room.
-  - Set ionizer to 10A.� This will lead to a rise in the vacuum pressure.+  - Set ionizer to 10A. This will lead to a rise in the vacuum pressure.
   - Wait for vacuum to fall back to the blue mark on the gauge   - Wait for vacuum to fall back to the blue mark on the gauge
-  - Raise the ionizer by an additional� 2-3 A and wait for the vacuum to fall back into the blue range. +  - Raise the ionizer by an additional 2-3 A and wait for the vacuum to fall back into the blue range. 
-  - Repeat this process until the ionizer is at 21 A and the vacuum is in the blue range.+  - Repeat this process until the ionizer is at 21 A and the vacuum is in the blue range, may take 8 hours.
   - Open the source gate valve and carry out the Startup and Normal Operation.   - Open the source gate valve and carry out the Startup and Normal Operation.
  
 ** Checklist for Target Pellet Change ** ** Checklist for Target Pellet Change **
  
-  * FIXME To be provided... (SEE THE GREEN NOTEBOOK ON THE CONSOLE)+  * [[sputter:​pellet|Sputter Source Target Pellet Change]]
  
 ** Shut Down Procedure ** ** Shut Down Procedure **
  
-  - Turn down the reservoir heater power supply. ​ Off is about 0.070 A.+  - Turn down the cesium ​reservoir heater power supply. ​ Off is about 0.070 A.
   - Wait for the reservoir temperature to drop below 80° C.  ​   - Wait for the reservoir temperature to drop below 80° C.  ​
   - Turn down the feed tube power supply.   - Turn down the feed tube power supply.
Line 60: Line 59:
   - Turn off DEL high voltage supply.   - Turn off DEL high voltage supply.
   - Close sputter source vacuum gate valve.   - Close sputter source vacuum gate valve.
- 
-** Original Credits ** 
-\\  
-Maintained by:\\ 
-Thomas N. Massey\\ 
-Office: Accelerator Lab 217\\ 
-Telephone: (740)593-0933\\ 
-E-Mail: massey@ohio.edu\\ 
-Last modified on 12/​06/​2006\\ 
  
  