User Tools

Site Tools


playground:sputter

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
playground:sputter [2009/03/19 15:15]
odonnell Format changed to use doku wiki numbered lists (which have line wrap) instead of original numbered lines (which don't).
playground:sputter [2009/04/15 14:21]
odonnell
Line 3: Line 3:
 ** Cs Sputter Source Startup Procedure ** ** Cs Sputter Source Startup Procedure **
  
-Last modified on 12/​06/​2006 +Last modified on 2009 March 19, 15:20\\
-General Considerations+
  
-Cs Sputter Source Cutaway Diagram +** General Considerations ** 
-Cs Sputter Source High Voltage Supplies+
  
-    ​* The proper target ​ must be installed. +  * Review these illustrations:​ 
-    * The base pressure of 2 x 10E-6 torr or less.+    * [[cutaway|Cs Sputter Source Cutaway Diagram]] 
 +    * [[hvsupplies|Cs Sputter Source High Voltage Supplies]] 
 +  ​* The proper target ​ must be installed. ​ (See Devon.) 
 +  * The base pressure of 2 × 10<​sup>​-6</​sup> ​torr or less.
   ​   ​
 ** General Preparations ** ** General Preparations **
Line 20: Line 21:
   - Open source gate valve by pressing either button on gate valve control at source gate.   - Open source gate valve by pressing either button on gate valve control at source gate.
   - Remove grounding hook from power supply platform and hang on gate before closing.� ​   - Remove grounding hook from power supply platform and hang on gate before closing.� ​
-  - Close gate to source area.  Orange lights on Glassman supplies should come on at gate closing. ​+  - Close gate to source area.  Orange lights on Glassman supplies should come on at gate closing. ​ (If not, check other gate on the other side of the accelerator;​ both must be secured.) ​
   - Use long plexi rod to turn on top 2 Glassmans (target and extractor) by pushing green buttons.   - Use long plexi rod to turn on top 2 Glassmans (target and extractor) by pushing green buttons.
  
Line 46: Line 47:
 ** Checklist for Target Pellet Change ** ** Checklist for Target Pellet Change **
  
-  * FIXME To be provided...+  * FIXME To be provided... ​(SEE THE GREEN NOTEBOOK ON THE CONSOLE)
  
 ** Shut Down Procedure ** ** Shut Down Procedure **
playground/sputter.txt · Last modified: 2023/08/22 07:50 by carter