User Tools

Site Tools


playground:sputter

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
playground:sputter [2009/03/19 15:15]
odonnell Format changed to use doku wiki numbered lists (which have line wrap) instead of original numbered lines (which don't).
playground:sputter [2009/03/19 15:18]
odonnell Add note about checking second gate if Glassman supplies don't come on.
Line 20: Line 20:
   - Open source gate valve by pressing either button on gate valve control at source gate.   - Open source gate valve by pressing either button on gate valve control at source gate.
   - Remove grounding hook from power supply platform and hang on gate before closing.� ​   - Remove grounding hook from power supply platform and hang on gate before closing.� ​
-  - Close gate to source area.  Orange lights on Glassman supplies should come on at gate closing. ​+  - Close gate to source area.  Orange lights on Glassman supplies should come on at gate closing. ​ (If not, check other gate on the other side of the accelerator;​ both must be secured.) ​
   - Use long plexi rod to turn on top 2 Glassmans (target and extractor) by pushing green buttons.   - Use long plexi rod to turn on top 2 Glassmans (target and extractor) by pushing green buttons.
  
playground/sputter.txt · Last modified: 2023/08/22 07:50 by carter