User Tools

Site Tools


playground:pulsing

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
playground:pulsing [2009/04/16 10:57]
132.235.40.233
playground:pulsing [2013/05/24 16:11]
carter
Line 1: Line 1:
 === Accelerator Start-Up - Chopping and Bunching === === Accelerator Start-Up - Chopping and Bunching ===
  
-Last modified 2009 April 15, 16:10 
  
 ** Starting and Tuning Pulsed and Bunched Beam ** ** Starting and Tuning Pulsed and Bunched Beam **
  
    - Start up source and described in the [[playground:​sputter|Sputter Source]] or [[playground:​alpha|Duoplasmatron Source]] instructions.    - Start up source and described in the [[playground:​sputter|Sputter Source]] or [[playground:​alpha|Duoplasmatron Source]] instructions.
-   - With the low energy cup in, tune for maximum current using the inflection magnet, two einzel lenses, and the steerers 2X, and 2Y.  ​+   - With the low energy cup in, tune for maximum current using the proper tuning devices for the given source.  ​
    - Set auxiliary width at maximum.    - Set auxiliary width at maximum.
    - Turn on oscillator -- beam current will drop.  ​    - Turn on oscillator -- beam current will drop.  ​
Line 16: Line 15:
    - Turn "​chopper power" on.    - Turn "​chopper power" on.
    - Turn buncher on.    - Turn buncher on.
-   - Bring amplifier plate to 1 keV for for deuteron or protons, 0.2-0.4 ​keV for He-3 and He-4, and 0.5-0.75 ​keV for Li-7.+   - Bring amplifier plate to 1 kV for for deuteron or protons, 0.2-0.4 ​kV for He-3 and He-4, and 0.5-0.75 ​kV for Li-7.
    - Adjust buncher phase for maximum current.    - Adjust buncher phase for maximum current.
    - Adjust buncher tuning for peak output current by cranking the tuning knob.    - Adjust buncher tuning for peak output current by cranking the tuning knob.
-   ​- ​Get high energy ​end of the accelerator going.+   ​- ​Proceed to the high energy ​cup and tune beam.
    - Adjust low energy steerers to maximize the beam.  Try to run the steerers as low as possible and avoid doglegs.    - Adjust low energy steerers to maximize the beam.  Try to run the steerers as low as possible and avoid doglegs.
    - Adjust the "​GRIDDED VOLTAGE TUBE LENS" to maximize the current. ​  Note that this has a slow response time.    - Adjust the "​GRIDDED VOLTAGE TUBE LENS" to maximize the current. ​  Note that this has a slow response time.
-   ​- ​Get beam through the analyzing magnet following steps in the Machine Setup steps 11-13 above. +   ​- ​Send the beam on thru the Pick Off you intend to use.
-   - Make sure proper doors are closed, and target cooling, etc. are on and take the beam into the target area.+
    - Adjust H.E. steering, quads, tweaking magnet, etc. to maximize beam current.    - Adjust H.E. steering, quads, tweaking magnet, etc. to maximize beam current.
-   - Examine beam pick-off repetition rate;  if you have adjusted the chopper and buncher properly it should read 500,000 at f/1. +   - Adjust auxiliary width for beam current; this will affect both beam current and timing and will need to be set when the final timing is set.   
-   - If you are using a gold foil:  +   - Examine beam pick-off repetition rate;  if you have adjusted the chopper and buncher properly it should read the proper frequency for the f/you are using.  ​[[See the repetition rate list]]
-      - put the cup in, then  +   ​- ​Send the time-tuned beam to target
-      - put gold foil in, then  +
-      - take out cup.  ​ +
-      - Look at TAC output. ​  +
-      - Adjust chopper phase, buncher phase and amplifier plate to obtain best time tune. +
-      - put the cup in, +
-      - take out gold foil +
-      - take cup out  +
-   ​- ​Run time-tuned beam to target+
    - Make final adjustments as necessary using detector timing if needed    - Make final adjustments as necessary using detector timing if needed
  
 +{{playground:​pulsing.pdf|Original HVEC Pulsing and Bunching instruction manual.}}
 +
 +{{playground:​chopper_howo.pdf|Instructional diagram about chopper operation}}
 +
 +{{playground:​buncher_howto.pdf|Instructional diagram about buncher operation}}
 +
 +{{playground:​bpo.pdf|Instructional diagram about beam pickoff operation}}
  
playground/pulsing.txt · Last modified: 2023/01/27 07:11 by carter