User Tools

Site Tools


playground:power

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
playground:power [2010/07/30 12:01]
132.235.40.102
playground:power [2010/07/30 13:11]
132.235.40.102
Line 1: Line 1:
-POWER INTERRUPTION RECOVERY +**POWER INTERRUPTION RECOVERY**
 This process will guide the operator through the steps to recover from a brief ( less than 1 minute ) power interruption. ​ The goal is to quickly restore critical support systems before they reach an inoperable state. ​ This process should take less than 3 minutes. This process will guide the operator through the steps to recover from a brief ( less than 1 minute ) power interruption. ​ The goal is to quickly restore critical support systems before they reach an inoperable state. ​ This process should take less than 3 minutes.
  
playground/power.txt · Last modified: 2020/07/12 13:43 by carter