canonical:facility
Facility Shutdown
- Put in all cups
- Shutdown the Accelerator
- Shutdown the Source
- Run all magnets down to zero
- Set all electrostatic devices to zero or neutral, and then turn off
- Turn of the Beam Profile Monitor
- Close Gate Valves: Beam Leg, HE Tube, LE Tube, and Source Tube.
- Turn off TVs
- Turn off all lights
canonical/facility.txt · Last modified: by 127.0.0.1
