sputter:pellet
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| sputter:pellet [2011/08/17 09:35] – Split some steps so each action is a numbered step, fixed some spelling and grammar, added some additonal detail /JEO 132.235.40.233 | sputter:pellet [2026/06/25 16:12] (current) – external edit 127.0.0.1 | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| ====== Cesium Sputter Source Target Change ====== | ====== Cesium Sputter Source Target Change ====== | ||
| - | ===== (Revised | + | ===== (Revised |
| - Obtain proper target. | - Obtain proper target. | ||
| + | - Also, determine the proper Buncher Tube setting if you are changing beam species. | ||
| - Turn off DEL HIGH VOLTAGE POWER SUPPLY | - Turn off DEL HIGH VOLTAGE POWER SUPPLY | ||
| - Record present value and decrease Cesium Reservoir Current by 50%, usually to about 0.125 amp. | - Record present value and decrease Cesium Reservoir Current by 50%, usually to about 0.125 amp. | ||
| Line 10: | Line 11: | ||
| - Decrease Extractor Voltage to zero. | - Decrease Extractor Voltage to zero. | ||
| - At gate in vault, open gate - the orange lights on the Glassman supplies should go off. If not, stop and get help. | - At gate in vault, open gate - the orange lights on the Glassman supplies should go off. If not, stop and get help. | ||
| - | - Hang large ground hook at red arrow on power platform. | + | - Hang large ground hook at red arrow on power platform. |
| - | - At the source, hang small ground | + | |
| - Close gate valve between source and inflection magnet. Controller on source base below gate valve. | - Close gate valve between source and inflection magnet. Controller on source base below gate valve. | ||
| - Check that the source box Ion gauge is on and controller display can be seen from the source head area. You will need to see the pressure in the source box during later steps. | - Check that the source box Ion gauge is on and controller display can be seen from the source head area. You will need to see the pressure in the source box during later steps. | ||
| Line 20: | Line 20: | ||
| - Close hand gate valve by pushing down on the black knob firmly. | - Close hand gate valve by pushing down on the black knob firmly. | ||
| - Open the small green roughing valve (on plastic hose) at the target air lock to vent the target area. | - Open the small green roughing valve (on plastic hose) at the target air lock to vent the target area. | ||
| - | - (Wear gloves) | + | - (Wear gloves) |
| - (Wear gloves) Remove the used target. | - (Wear gloves) Remove the used target. | ||
| - (wear gloves) Install new target; thread on finger tight (Al foil is no longer used). | - (wear gloves) Install new target; thread on finger tight (Al foil is no longer used). | ||
| Line 36: | Line 36: | ||
| - Close the small valve labeled “VAC’M” on the left side of the source. | - Close the small valve labeled “VAC’M” on the left side of the source. | ||
| - Open the small valve labeled “VENT” | - Open the small valve labeled “VENT” | ||
| - | - Remove the small ground hook from the source head. | ||
| - Open gate valve between source and inflection magnet. | - Open gate valve between source and inflection magnet. | ||
| - | - Remove large ground hook from power platform and close gate. The orange lights on Glassman power supplies should light up, if not, try pushing the boost button on the wall. If this still does not make the lights come on, wait a few minutes and try again (leave gate open while waiting to let the actuator cool). | + | - Unground the Alpha source and close the gate on that side of the room. |
| - | | + | - Remove large ground hook from power platform, hang on the gate, and close the gate. The orange lights on Glassman power supplies should light up, if not, try pushing the boost button on the wall. If this still does not make the lights come on, wait a few minutes and try again (leave gate open while waiting to let the actuator cool). |
| + | | ||
| - In control room, turn on Del Main Extractor supply to the previous value. | - In control room, turn on Del Main Extractor supply to the previous value. | ||
| - Return ionizer to 21 A. | - Return ionizer to 21 A. | ||
| Line 46: | Line 46: | ||
| - Return the Cesium reservoir to the previous value. | - Return the Cesium reservoir to the previous value. | ||
| - | ==== Two hours should produce beam with a previously used pellet. | + | ==== Two hours should produce beam with a previously used pellet. |