| ====== Cesium Sputter Source Target Change ====== | ====== Cesium Sputter Source Target Change ====== | ||
| - | ===== (Revised | + | ===== (Revised |
| - Obtain proper target. | - Obtain proper target. | ||
| + | - Also, determine the proper Buncher Tube setting if you are changing beam species. | ||
| - Turn off DEL HIGH VOLTAGE POWER SUPPLY | - Turn off DEL HIGH VOLTAGE POWER SUPPLY | ||
| - | - Record present value and decrease Cesium Reservoir Current | + | - Record present value and decrease Cesium Reservoir Current |
| - | - Decrease Ionizer Current | + | - Decrease Ionizer Current |
| - | - Decrease Target Voltage | + | - Decrease Target Voltage |
| + | - Decrease | ||
| - At gate in vault, open gate - the orange lights on the Glassman supplies should go off. If not, stop and get help. | - At gate in vault, open gate - the orange lights on the Glassman supplies should go off. If not, stop and get help. | ||
| - | - Hang large ground hook at red arrow on power platform. | + | - Hang large ground hook at red arrow on power platform. |
| - | - At the source, hang small ground | + | |
| - Close gate valve between source and inflection magnet. Controller on source base below gate valve. | - Close gate valve between source and inflection magnet. Controller on source base below gate valve. | ||
| - | - Check to be sure the source box Ion gage is on and controller display can be seen from the source head area. | + | - Check that the source box Ion gauge is on and controller display can be seen from the source head area. You will need to see the pressure in the source box during later steps. |
| - | | + | |
| - | - Remove the red banana plug (white wire) from the end of the target holder | + | - Back off BRASS target positioner and set it aside. |
| - | | + | - Remove the red banana plug (white wire) from the end of the target holder. |
| - | | + | - Slowly |
| + | | ||
| + | - Open the small green roughing valve (on plastic hose) at the target air lock to vent the target area. | ||
| + | | ||
| + | | ||
| - (wear gloves) Install new target; thread on finger tight (Al foil is no longer used). | - (wear gloves) Install new target; thread on finger tight (Al foil is no longer used). | ||
| - | - Re-insert target holder and tighten the silver O-ring collar snugly ( by hand only). | + | - Re-insert target holder and tighten the silver O-ring collar snugly (by hand only). |
| - | - Close the small valve labeled “VENT” on the roughing line on the left side of the source. | + | - Close the small valve labeled “VENT” on the roughing line on the left side of the source. |
| - | | + | |
| - | - SLOWLY open hand gate value. | + | - Watching |
| - | - Hold the brass positioner in place and allow the assembly to slide forward. Begin threading the brass positioner when it contacts the rod and stop when it reaches the jam nuts. It does not have to be tight. | + | - Close the small green valve at the target air lock |
| + | - Watch the ION GAGE DISPLAY FOR NEXT STEP. | ||
| + | - SLOWLY open hand gate value. | ||
| + | - Hold the brass positioner in place on its bracket | ||
| - Reattach red banana plug (white wire) on target holder. | - Reattach red banana plug (white wire) on target holder. | ||
| - Pressure may rise slightly as the pellet heats up. | - Pressure may rise slightly as the pellet heats up. | ||
| - | | + | - Re-tighten the silver O-ring collar by hand. |
| - | - Close the small valve labeled “VAC’M” on the left side of the source. | + | - Close the small valve labeled “VAC’M” on the left side of the source. |
| - | - Remove the small ground hook from the source head. | + | |
| - Open gate valve between source and inflection magnet. | - Open gate valve between source and inflection magnet. | ||
| - | - Remove large ground hook from power platform and close gate. The orange lights on Glasman | + | - Unground the Alpha source and close the gate on that side of the room. |
| - | | + | - Remove large ground hook from power platform, hang on the gate, and close the gate. The orange lights on Glassman |
| - | - In control room, turn on Del Main Extractor supply to the previous value and return | + | |
| + | - In control room, turn on Del Main Extractor supply to the previous value. | ||
| + | - Return | ||
| - Slowly raise the extractor voltage to 12.5 KV. If you see twitching in the voltage or current meters, stop at that point and wait a few minutes for stability before going higher, until extractor is at 12.5 KV. The twitching will most likely happen if the target pellet was previously used. | - Slowly raise the extractor voltage to 12.5 KV. If you see twitching in the voltage or current meters, stop at that point and wait a few minutes for stability before going higher, until extractor is at 12.5 KV. The twitching will most likely happen if the target pellet was previously used. | ||
| - Slowly raise the target voltage to 6.5 KV. If you see twitching in the voltage or current meters, stop at that point and wait a few minutes for stability before going higher, until target is at 6.5 KV. The twitching will most likely happen if the target pellet was previously used. | - Slowly raise the target voltage to 6.5 KV. If you see twitching in the voltage or current meters, stop at that point and wait a few minutes for stability before going higher, until target is at 6.5 KV. The twitching will most likely happen if the target pellet was previously used. | ||
| - Return the Cesium reservoir to the previous value. | - Return the Cesium reservoir to the previous value. | ||
| - | ==== Two hours should produce beam with a previously used pellet. | + | ==== Two hours should produce beam with a previously used pellet. |