playground:sputter
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| playground:sputter [2021/03/22 11:04] – carter | playground:sputter [2026/06/25 16:12] (current) – external edit 127.0.0.1 | ||
|---|---|---|---|
| Line 17: | Line 17: | ||
| - Ensure that desired beam target is loaded. | - Ensure that desired beam target is loaded. | ||
| - | - Set buncher tube selector switch to correct configuration for desired beam species. | + | - Set buncher tube selector switch to correct configuration for desired beam species. |
| - Check vacuum on LE extension, temperature gauge on cryopump should be at minimum value. | - Check vacuum on LE extension, temperature gauge on cryopump should be at minimum value. | ||
| - Open source gate valve by pressing either button on gate valve control at source gate. | - Open source gate valve by pressing either button on gate valve control at source gate. | ||
| Line 23: | Line 23: | ||
| - Remove grounding hook from power supply platform and hang on gate before closing. | - Remove grounding hook from power supply platform and hang on gate before closing. | ||
| - Close both gates to source area. Orange lights on Glassman supplies should come on at gate closing. | - Close both gates to source area. Orange lights on Glassman supplies should come on at gate closing. | ||
| - | - Press the doorbell button on top the Pelletron AC Power Center. | + | - Press the "doorbell" |
| + | - NOTE: In addition to the " | ||
| ** Startup and Normal Operation (in control room) ** | ** Startup and Normal Operation (in control room) ** | ||
playground/sputter.1616425442.txt.gz · Last modified: (external edit)