| ** Cs Sputter Source Startup Procedure ** | ** Cs Sputter Source Startup Procedure ** | ||
| - | Last modified on 2009 March 19, 15:20\\ | + | |
| ** General Considerations ** | ** General Considerations ** | ||
| * Review these illustrations: | * Review these illustrations: | ||
| + | * [[Cs_labeled|Cs Sputter Source Labeled Cutaway Diagram]] | ||
| * [[cutaway|Cs Sputter Source Cutaway Diagram]] | * [[cutaway|Cs Sputter Source Cutaway Diagram]] | ||
| * [[hvsupplies|Cs Sputter Source High Voltage Supplies]] | * [[hvsupplies|Cs Sputter Source High Voltage Supplies]] | ||
| Line 16: | Line 17: | ||
| - Ensure that desired beam target is loaded. | - Ensure that desired beam target is loaded. | ||
| - | - Set buncher | + | - Set buncher |
| - Check vacuum on LE extension, temperature gauge on cryopump should be at minimum value. | - Check vacuum on LE extension, temperature gauge on cryopump should be at minimum value. | ||
| - Open source gate valve by pressing either button on gate valve control at source gate. | - Open source gate valve by pressing either button on gate valve control at source gate. | ||
| + | - Set cesium reservoir controller temperature set point (green numbers): | ||
| - Remove grounding hook from power supply platform and hang on gate before closing. | - Remove grounding hook from power supply platform and hang on gate before closing. | ||
| - Close both gates to source area. Orange lights on Glassman supplies should come on at gate closing. | - Close both gates to source area. Orange lights on Glassman supplies should come on at gate closing. | ||
| - | - Press the doorbell button on top the Pelletron AC Power Center. | + | - Press the "doorbell" |
| + | - NOTE: In addition to the " | ||
| ** Startup and Normal Operation (in control room) ** | ** Startup and Normal Operation (in control room) ** | ||
| - Turn on and set the **Del main extractor** supply to the desired voltage for the particular buncher setting. | - Turn on and set the **Del main extractor** supply to the desired voltage for the particular buncher setting. | ||
| - | - Turn up the ionizer heater. | + | - Turn up the **ionizer** heater. |
| - Turn up the Cesium **feed tube** heater to 0.450 amperes. | - Turn up the Cesium **feed tube** heater to 0.450 amperes. | ||
| - | - Set the cesium **reservoir** heater to 0.275. This should be enough to give ones of microamps beam for p and d. A setting of about 0.280 - 0.300 should produce tens of microamps. Cs vaporization starts at a temperature of ~80° Celsius. | + | - Set the cesium **reservoir** heater |
| - Set the Glassman **extractor** power supply to 12.5 KV. Check to be sure the current is less than about 5 milliamps and the " | - Set the Glassman **extractor** power supply to 12.5 KV. Check to be sure the current is less than about 5 milliamps and the " | ||
| - | - Set the Glassman **target** power supply to 6.5 kV. Check to be sure the current is less than about 5 milliamps and the " | + | - Set the Glassman **target** power supply to 6.5 kV. Check to be sure the current is less than about 5 milliamps and the " |
| - Set the Glassman **lens** power supply to 1.5 kV. | - Set the Glassman **lens** power supply to 1.5 kV. | ||
| - | - **Tune the beam with the inflection magnet, source lens (usually about 1.5 kV), einzel lens A, and 2Y steerer.** | + | - **Tune the beam with the inflection magnet, source lens (usually about 1.5 kV), einzel lens A, and 2Y steerer.** |
| - | - Monitor the target and extractor currents: target current should be around 2.5 milliamps, and no more than 5 mA. | + | - Monitor the target and extractor currents: target current should be around 2.5 milliamps, and no more than 5 mA. If target current gets too high, reduce the cesium reservoir setting. |
| ** Out-gassing the source after cleaning ** | ** Out-gassing the source after cleaning ** | ||
| Line 50: | Line 54: | ||
| ** Shut Down Procedure ** | ** Shut Down Procedure ** | ||
| - | - Turn down the cesium | + | - **Cesium |
| - | - Wait for the reservoir temperature to drop below 80° C. | + | - Wait until the reservoir controller' |
| + | - Wait for the reservoir temperature | ||
| - Turn down the feed tube power supply. | - Turn down the feed tube power supply. | ||
| - Wait for the feed tube temperature to drop below 80° C. | - Wait for the feed tube temperature to drop below 80° C. | ||