playground:sputter
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| playground:sputter [2009/04/15 15:56] – 132.235.40.97 | playground:sputter [2026/06/25 16:12] (current) – external edit 127.0.0.1 | ||
|---|---|---|---|
| Line 3: | Line 3: | ||
| ** Cs Sputter Source Startup Procedure ** | ** Cs Sputter Source Startup Procedure ** | ||
| - | Last modified on 2009 March 19, 15:20\\ | + | |
| ** General Considerations ** | ** General Considerations ** | ||
| * Review these illustrations: | * Review these illustrations: | ||
| + | * [[Cs_labeled|Cs Sputter Source Labeled Cutaway Diagram]] | ||
| * [[cutaway|Cs Sputter Source Cutaway Diagram]] | * [[cutaway|Cs Sputter Source Cutaway Diagram]] | ||
| * [[hvsupplies|Cs Sputter Source High Voltage Supplies]] | * [[hvsupplies|Cs Sputter Source High Voltage Supplies]] | ||
| Line 16: | Line 17: | ||
| - Ensure that desired beam target is loaded. | - Ensure that desired beam target is loaded. | ||
| - | - Set buncher | + | - Set buncher |
| - | - Check vacuum on LE extension.� | + | - Check vacuum on LE extension, temperature |
| - | - Temperature | + | |
| - Open source gate valve by pressing either button on gate valve control at source gate. | - Open source gate valve by pressing either button on gate valve control at source gate. | ||
| - | - Remove grounding hook from power supply platform and hang on gate before closing.� | + | |
| - | - Close gate to source area. Orange lights on Glassman supplies should come on at gate closing. | + | |
| - | - Use long plexi rod to turn on top 2 Glassmans (target | + | - Close both gates to source area. Orange lights on Glassman supplies should come on at gate closing. |
| + | - Press the " | ||
| + | - NOTE: In addition to the " | ||
| ** Startup and Normal Operation (in control room) ** | ** Startup and Normal Operation (in control room) ** | ||
| - | - Turn on and set the Del main extractor supply to the desired voltage for the particular buncher setting. | + | - Turn on and set the **Del main extractor** supply to the desired voltage for the particular buncher setting. |
| - | - Set the Glassman extractor power supply to 12.5 KV. Check to be sure the current is less than about 5 milliamps and the " | + | - Turn up the **ionizer** heater. |
| - | - Set the Glassman target power supply to 6.5 kV. Check to be sure the current is less than about 5 milliamps and the " | + | - Turn up the Cesium **feed tube** heater to 0.450 amperes. |
| - | - Slowly turn up the ionizer heater((This source has a HELICAL ionizer.)) in small steps. | + | - Set the cesium **reservoir** heater current to **0.315** Amps. This is an approximate value above the needed power level. |
| - | - Turn up the Cs feed tube heater to 0.450 amperes. | + | - Set the Glassman |
| - | - Set the cesium reservoir heater | + | - Set the Glassman |
| - | - Tune the beam with the inflection magnet, source lens (usually about 1.5 kV), lens A, and 2Y steerer. | + | - Set the Glassman **lens** power supply |
| - | - Monitor the target and extractor currents: target current should be around 2.5 milliamps, and no more than 5 mA. | + | - **Tune the beam with the inflection magnet, source lens (usually about 1.5 kV), einzel |
| + | - Monitor the target and extractor currents: target current should be around 2.5 milliamps, and no more than 5 mA. If target current gets too high, reduce the cesium reservoir setting. | ||
| ** Out-gassing the source after cleaning ** | ** Out-gassing the source after cleaning ** | ||
| Line 39: | Line 42: | ||
| - The source gate valve should be closed for this operation. | - The source gate valve should be closed for this operation. | ||
| - Wait for normal vacuum. | - Wait for normal vacuum. | ||
| - | - Set ionizer to 10A.� This will lead to a rise in the vacuum pressure. | + | - Set ionizer to 10A. This will lead to a rise in the vacuum pressure. |
| - Wait for vacuum to fall back to the blue mark on the gauge | - Wait for vacuum to fall back to the blue mark on the gauge | ||
| - | - Raise the ionizer by an additional� 2-3 A and wait for the vacuum to fall back into the blue range. | + | - Raise the ionizer by an additional 2-3 A and wait for the vacuum to fall back into the blue range. |
| - | - Repeat this process until the ionizer is at 21 A and the vacuum is in the blue range. | + | - Repeat this process until the ionizer is at 21 A and the vacuum is in the blue range, may take 8 hours. |
| - Open the source gate valve and carry out the Startup and Normal Operation. | - Open the source gate valve and carry out the Startup and Normal Operation. | ||
| Line 51: | Line 54: | ||
| ** Shut Down Procedure ** | ** Shut Down Procedure ** | ||
| - | - Turn down the reservoir | + | - **Cesium |
| - | - Wait for the reservoir temperature to drop below 80° C. | + | - Wait until the reservoir controller' |
| + | - Wait for the reservoir temperature | ||
| - Turn down the feed tube power supply. | - Turn down the feed tube power supply. | ||
| - Wait for the feed tube temperature to drop below 80° C. | - Wait for the feed tube temperature to drop below 80° C. | ||
| Line 60: | Line 64: | ||
| - Turn off DEL high voltage supply. | - Turn off DEL high voltage supply. | ||
| - Close sputter source vacuum gate valve. | - Close sputter source vacuum gate valve. | ||
| - | |||
| - | ** Original Credits ** | ||
| - | \\ | ||
| - | Maintained by:\\ | ||
| - | Thomas N. Massey\\ | ||
| - | Office: Accelerator Lab 217\\ | ||
| - | Telephone: (740)593-0933\\ | ||
| - | E-Mail: massey@ohio.edu\\ | ||
| - | Last modified on 12/ | ||
playground/sputter.1239825402.txt.gz · Last modified: (external edit)
