playground:interlock
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| playground:interlock [2012/02/10 12:41] – jacobs | playground:interlock [2026/06/25 16:12] (current) – external edit 127.0.0.1 | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | | + | **Testing Policy & Interlock Rules** |
| - | - No Operator will intentionally bypass a safety interlock. | + | |
| - | - Discovery of a failed safety interlock or warning device will suspend all operations until that failure can be repaired. | + | - All safety and warning devices, including interlocks, shall be checked for proper operation at intervals not to exceed three months. |
| + | - Such testing shall be the responsibility of Accelerator Staff. | ||
| + | - Interlock Testing: | ||
| + | - All audible and visual indicators will be checked for proper operation during each test. | ||
| + | - **In the event the safety equipment is operating improperly, it shall be immediately reported to the RSO/IRRP and shall be repaired or replaced and never bypassed so as to enable radiation production.** | ||
| + | - Calibration of fixed and portable monitoring equipment shall be the responsibility of the RSO/IRRP. | ||
| + | - Calibrations shall be at intervals not to exceed one year and after each servicing or repair. | ||
| + | - Records of calibrations shall be maintained in the Testing, Calibration, | ||
| + | - **Portable monitoring equipment shall be tested for proper operation daily, prior to use, when in use.** | ||
| + | | ||
| + | - **No Operator will intentionally bypass a safety interlock.** | ||
| + | - **Discovery of a failed safety interlock or warning device will suspend all operations until that failure can be repaired.** | ||
| - If, for any reason, the TALC finds it necessary to intentionally bypass a safety interlock this action shall be: | - If, for any reason, the TALC finds it necessary to intentionally bypass a safety interlock this action shall be: | ||
| - | * | + | - Authorized by the OU Radiation Safety Officer |
| - | | + | |
| - | | + | |
| - | | + | |
playground/interlock.1328895692.txt.gz · Last modified: (external edit)
