| February 2012 | February 2012 | ||
| Line 25: | Line 25: | ||
| 3. The EMO and Radiation Monitor System are independent. | 3. The EMO and Radiation Monitor System are independent. | ||
| - | 4. A new Shutdown Module will be designed and constructed by the Nuclear Instrumentation Engineer that complies with this design logic. | + | 4. We have great confidence in the safety provided by the original Shut-down |
| 5. We consider this requirement to be met by having to ensure that a door interlock is properly engaged after a shutdown by the Radiation Monitor System, or by having to reset the EMO button in that type of shutdown. | 5. We consider this requirement to be met by having to ensure that a door interlock is properly engaged after a shutdown by the Radiation Monitor System, or by having to reset the EMO button in that type of shutdown. | ||
| Line 55: | Line 55: | ||
| 1. The control room is part of a secured area which is only accessible by trained and qualified personnel. | 1. The control room is part of a secured area which is only accessible by trained and qualified personnel. | ||
| - | 2. Operators are trained for this requirement by the Interlock | + | 2. Operators are trained for this requirement by the Interlock |
| - | 3. Policy governing this requirement is found in Rad Safety Handbook Appendix. Results of tests are found in the Test, Calibration, | + | 3. Policy governing this requirement is found in the Testing, Calibration, |
| 4. The Shutdown/ | 4. The Shutdown/ | ||
| Line 63: | Line 63: | ||
| 5. The Operating Procedures and Emergency Procedures books meet this | 5. The Operating Procedures and Emergency Procedures books meet this | ||
| - | 6. The Interlock | + | 6. The Interlock |
| 7. | 7. | ||
| Line 93: | Line 92: | ||
| a. All sections of Appendix A are addressed in the Operator 1 training flow | a. All sections of Appendix A are addressed in the Operator 1 training flow | ||
| - | b. Source material located in Appendix 16 of the Radiation Safety Handbook | + | b. Source material located in the Training Flow & Documentation Book, or in the electronic handbook (wiki) |
| c. Source material located in Operating Procedures and Emergency Procedures books | c. Source material located in Operating Procedures and Emergency Procedures books | ||
| - | 2. Operator 1 certification will meet this requirement. | + | 2. Operator 1 certification will meet this requirement. |