playground:alphatross
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| playground:alphatross [2021/03/22 10:20] – carter | playground:alphatross [2026/06/25 16:12] (current) – external edit 127.0.0.1 | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ==== NEC Alphatross RF Source Instructions ==== | + | ====== NEC Alphatross RF Source Instructions ====== |
| - | + | ||
| - | ** __START UP__ ** | + | |
| - | ** In the Vault ** | + | === START UP === |
| - | - LE Extension vacuum must be good as evidenced by Ion Gauge controller with orange displays on magnet. | + | == In the Vault == |
| - | - Source vacuum must be good as evidenced by Ion Gauge controller with blue displays in 19" rack. | + | |
| - | - Unground alpha source and hang shepherd' | + | |
| - | - Set buncher tube selector switch to correct configuration for desired beam species. | + | |
| - | - Go around and unground sputter source, hang shepherd' | + | |
| - | ** In the Control Room ** | ||
| - | - Source camera must have a view of the faraday | + | |
| + | - Verify Source Vacuum - indicated Ion Gauge controller with blue displays in 19" rack. | ||
| + | - Unground alpha source and hang shepherd' | ||
| + | - Close Alphatross gate and verify interlocks OK by observing indicator light. | ||
| + | - Set buncher tube selector switch - see [[playground: | ||
| + | - Unground sputter source [optional], hang shepherd' | ||
| + | - Close Sputter source gate. | ||
| + | |||
| + | == In the Control Room == | ||
| + | |||
| + | | ||
| - To gain control of the source camera: On the joystick unit press " | - To gain control of the source camera: On the joystick unit press " | ||
| - | - Use the joystick and " | + | - Use the joystick and " |
| - If not already present, launch the Alphatross software (Version 6.0) on the source computer. | - If not already present, launch the Alphatross software (Version 6.0) on the source computer. | ||
| - | - In prompt succession press the " | + | |
| + | - operates independently of the source and the HV interlocks. | ||
| + | - contains a flow switch that must be closed in order to start the source. | ||
| + | - provides heat to prevent Rb freezing. | ||
| + | - provides cooling to the magnet in the source. | ||
| + | | ||
| - These actions start a 60 second timer on the RF supply and set initial conditions on the Magnet and Mass Flow Controller. | - These actions start a 60 second timer on the RF supply and set initial conditions on the Magnet and Mass Flow Controller. | ||
| - | - After 60 seconds the RF power starts, gives a reading on the meter above the faraday | + | |
| - | - Plasma or not, raise the Magnet to 4 A, maybe the plasma | + | |
| - | - Monitor | + | - gives a reading on the meter above the Faraday |
| - | - Raise the Probe Voltage to 3 KV as a start, this might be enough to get the plasma going. Monitor the Probe Current, maintain 3 mA +/- 1 mA, and continue | + | - may ignite |
| - | - If there is still no plasma try raising the Mass Flow setting to as much as 0.5 SCCM to inspire ignition and then return to 0.35 SCCM. | + | - Raise the Magnet |
| - | - **This | + | - If the plasma has not ignited |
| - | - Set the Oven Voltage to 80 V. Wait until the Oven Temperature is at least 160 C, 10 - 20 minutes. | + | - Raise the gas flow until the plasma |
| - | - Set the Extractor Voltage to 5.5 KV and the Bias Voltage to a value that gives the desired injection energy. | + | - Quickly lower the gas flow back to 0.350 SCCM (or your desired operating rate). |
| - | - You may now be able to look at negative beam in the source faraday | + | - Set the probe voltage by: |
| - | - Beam yield will increase as Mass Flow is reduced, expect | + | - Monitoring |
| - | - Optimize negative beam yield by tuning Focus Voltage, and Mass Flow. Adjust Bis Voltage accordingly if an exact injection energy is required for P&B. | + | - it should remain less than 4 x 10-6 Torr. |
| - | - Use software buttons to take out faraday | + | - Operating range is around 2 x 10-6 or less. |
| - | - Set Lens A to 10 KV and use the inflection magnet to pass beam on to the LE faraday | + | - Raise the Probe Voltage to 3 kV. |
| - | - You may need to re-tune with Focus Voltage and Mass Flow setting. | + | |
| - | | + | - Continue |
| - | - The maximum Oven Temperature is around 190 C, seems to be around 91 Volts. | + | - Maintain probe current less than 4mA. |
| + | - Source | ||
| + | - Source | ||
| + | - Set the Oven Voltage to 80 V. | ||
| + | - Set Extractor Voltage to 5kV. | ||
| + | - Set Bias Voltage to a value that gives desired injection energy. | ||
| + | - Injection | ||
| + | - Injection energy | ||
| + | - Beam yields improve | ||
| + | - Set the Focus Voltage to 5.5 kV | ||
| + | - Set the Faraday | ||
| + | - Tune for maximum __stable__ beam. | ||
| + | - Primary adjustment at this stage seems to be focus voltage. | ||
| + | - Current may be on the order of 30 μA. | ||
| + | - Set Einzel Lens to 20 kV. | ||
| + | - Wait until the Oven Temperature | ||
| + | - Tune for maximum stable beam using | ||
| + | - Focus Voltage | ||
| + | - Mass Flow - optimum around 0.25 SCCM. | ||
| + | - Verify | ||
| + | - Open source gate valve. | ||
| + | - Take our source Faraday | ||
| + | - Move FC selector switch | ||
| + | - Tune beam into FC | ||
| + | - Set inflection | ||
| + | - Typical beam currents at this stage are around 500 nA. | ||
| + | |||
| + | | ||
| - | ** __SHUT DOWN__ ** | + | ===SHUT DOWN=== |
| - Click the software button " | - Click the software button " | ||
| - | - Confirm you wish to quit be answering " | + | - Confirm you wish to quit by answering " |
| - Walk away. | - Walk away. | ||
| - ** Do not open the source gates until the process is finished ** | - ** Do not open the source gates until the process is finished ** | ||